ESC13-00795
| Site Preparation | 8/12/2013 | 8/12/2013 | | P | |
|
|
please call 30min ahead to meet if needed - chris Phone #: ###-####
|
ESC11-00873
| General Inspection | 8/15/2013 | 8/15/2013 | | | |
|
|
|
BLD13-02181
| BLD-Final | 8/16/2013 | 8/16/2013 | 8/16/2013 4:27:24 PM | P | DONE |
|
|
All work is complete. Phone #: ###-#### >> Inspection requested via web by Chris Howell
|
BLD13-02181
| DOC - Permit Finaled | 8/16/2013 | 8/16/2013 | 8/16/2013 4:26:36 PM | P | PASS |
|
|
done
|
BLD12-01838
| BLD-Final | 8/16/2013 | 8/16/2013 | 8/16/2013 4:25:31 PM | P | DONE |
|
|
|
BLD12-01838
| DOC - Permit Finaled | 8/16/2013 | 8/16/2013 | 8/16/2013 4:24:43 PM | P | PASS |
|
|
done
|
BLD13-01189
| BLD-Conference | 8/15/2013 | 8/16/2013 | 8/16/2013 4:16:37 PM | P | PART |
|
|
john Phone #: ###-####,, frame conf.. need straps,, furr downs,, fire blocking,, headers,, one under 4 ply,, one int wall,, ok to do seal pack w/ foam insulation
|
BLD13-01006
| BLD-Framing/Rough-in | 8/16/2013 | 8/16/2013 | 8/16/2013 4:11:32 PM | P | PART |
|
|
bob Phone #: ###-####,, master bath area ok to insulate
|
BLD13-01006
| BLD-Energy code compliance | 8/16/2013 | 8/16/2013 | 8/16/2013 4:05:33 PM | P | PEND |
|
|
bob Phone #: ###-####,, frame only,, master bath area ok to insulate
|
BLD12-02790
| BLD-Final | 8/16/2013 | 8/16/2013 | 8/16/2013 4:01:38 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO
|
BLD12-02790
| DOC - Permit Finaled | 8/16/2013 | 8/16/2013 | 8/16/2013 4:01:21 PM | P | PASS |
|
|
c of o issued
|
BLD12-00840
| BLD-Final | 8/16/2013 | 8/16/2013 | 8/16/2013 3:59:23 PM | P | PASS |
|
|
|
BLD12-00840
| DOC - Permit Finaled | 8/16/2013 | 8/16/2013 | 8/16/2013 3:57:01 PM | P | PASS |
|
|
c of c/o issued
|
BLD13-01908
| BLD-Foundation | 8/15/2013 | 8/16/2013 | 8/16/2013 3:33:33 PM | A | PART |
|
|
dillon Phone #: ###-####
|
BLD13-01189
| BLD-Framing/Rough-in | 8/15/2013 | 8/16/2013 | 8/16/2013 3:30:25 PM | A | PART |
|
|
john Phone #: ###-####,, main and upper ok to insulate
|
BLD12-00844
| BLD-Conference | 8/16/2013 | 8/16/2013 | 8/16/2013 1:37:50 PM | P | FAIL |
|
|
Per 325,, status review,, placed a SWO,, to much time,, needs to see plan review,, also enginered material has been exposed to the weather for a long period of time
|
BLD13-01705
| BLD-Wall Bracing | 8/15/2013 | 8/16/2013 | 8/16/2013 12:40:10 PM | A | PASS |
|
|
please call for access and to meet with GC - chris Phone #: ###-####
|
BLD13-02181
| BLD-Conference | 8/15/2013 | 8/16/2013 | 8/16/2013 12:08:07 PM | A | DONE |
|
|
All work is complete. Phone #: ###-#### >> Inspection requested via web by Chris Howell
|
BLD13-01220
| BLD-Energy code compliance | 8/15/2013 | 8/16/2013 | 8/16/2013 7:47:15 AM | A | PASS |
|
|
JOHN PLEASE CONTACT JOHN WHEN YOU GET THERE Phone #: ###-####
|
BLD13-01478
| BLD-Conference | 8/15/2013 | 8/16/2013 | | A | |
|
|
Tony, I received a letter from Shervik builders stating they are no longer the GC on this project as of Aug 5th ,that the owners are now the GCs. They have not come in as of this date,to transfer the permit. RI & energy done.
|