Inspections for the day of: Thursday, August 29, 2019.
Number of inspections: 30
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00266 BLD-Conference8/23/20198/26/2019 A 
status review
MIS19-00253 BLD-Conference8/23/20198/27/2019 P 
status review
MIS18-00431 MIS-Aging Inspection8/29/20198/29/20199/6/2019 1:35:26 PM CANC
MIS18-00430 MIS-Aging Inspection8/29/20198/29/20199/4/2019 11:06:44 AM DONE
BLD17-03026 BLD-Aging Inspection8/29/20198/29/20198/30/2019 2:15:20 PM FAIL
MIS18-00432 MIS-Aging Inspection8/29/20198/29/20198/30/2019 1:15:42 PM DONE
BLD16-02566 BLD-Aging Inspection8/29/20198/29/20198/30/2019 1:14:43 PM PEND
BLD19-00658 BLD-Footing8/28/20198/29/20198/29/2019 5:13:34 PMPPEND
Josh- rebar inspection and footing wall Phone #: ###-####,, pending special inspection report
BLD18-01728 BLD-Final8/29/20198/29/20198/29/2019 5:12:49 PMPDEFR
Larry Phone #: ###-####,, out of time
BLD19-02468 BLD-Framing/Rough-in8/29/20198/29/20198/29/2019 5:11:05 PMPNR
Danny Phone #: ###-####,, no plans
BLD19-01522 BLD-Energy code compliance8/28/20198/29/20198/29/2019 5:10:12 PMPNR
Ron Phone #: ###-####,, frame corrections not done
BLD19-01523 BLD-Energy code compliance8/28/20198/29/20198/29/2019 5:07:23 PMPNR
Ron Phone #: ###-####,, frame corrections not done
MIS19-00222 BLD-Conference8/12/20198/29/20198/29/2019 5:06:38 PMAPEND
Possible work without permits// status review
BLD19-01074 BLD-Final8/28/20198/29/20198/29/2019 5:06:19 PMPPEND
if you could please call 30 minutes ahead of time for the inspection that would be greatly appreciated Mike Teeter ###-####

Thanks
Mike Teeter
Phone #: ###-#### Inspection requested via web by Mike Teeter
BLD19-03046 BLD-Footing8/28/20198/29/20198/29/2019 4:12:59 PMPPART
Pat Phone #: ###-####.. work in progress
BLD19-00885 BLD-Energy code compliance8/28/20198/29/20198/29/2019 3:18:05 PMPPASS
Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD19-00885 BLD-Framing/Rough-in8/27/20198/29/20198/29/2019 3:16:28 PMPPASS
Phone #: ###-#### Inspection requested via web by Steve Hanson
BLD18-01759 BLD-Energy code compliance8/29/20198/29/20198/29/2019 3:08:50 PMPPASS
Ben Phone #: ###-####,, egress in basement to meet code
BLD19-01878 BLD-Conference8/28/20198/29/20198/29/2019 2:29:58 PMPCANC
Conference request to discuss framing and anchors. Phone #: ###-#### Inspection requested via web by Greg Stahl
BLD19-01878 BLD-Conference8/28/20198/29/20198/29/2019 2:29:33 PMPPASS
Conference request to discuss framing and anchors. Phone #: ###-#### Inspection requested via web by Greg Stahl,, normal code provisions,, ok to cut bolt off in the wrong location
BLD19-01026 BLD-Conference8/27/20198/29/20198/29/2019 2:01:43 PMANH
Phone #: 5124260574 >> Inspection requested via mobile web by Paul Coniglio
BLD19-02990 BLD-Footing8/28/20198/29/20198/29/2019 1:53:11 PMANR
plans are taped to porta John , if you want give me a 15 min heads up and I. Can Be there 208 703 6272 thanks Phone #: ###-#### Inspection requested via web by Chris Homeyer.. needs to meet back up area of 22'
BLD18-01441 BLD-Ceiling Grid Inspection8/28/20198/29/20198/29/2019 1:47:07 PMAPASS
Blake Phone #: ###-####,, ok to cover,, foam sprayed and then added blue foam at the rack ceiling line
BLD19-01426 BLD-Final8/28/20198/29/20198/29/2019 12:46:54 PMAPEND
Trevor-NEED TO TEXT Phone #: ###-####
BLD19-01852 BLD-Framing/Rough-in8/28/20198/29/20198/29/2019 12:28:32 PMAFAIL
Freg Phone #: ###-####,, c/n posted,, cut joists, straps, block joists, nail hangers, seal holes in plates, tighten hold down nuts, support stringer, etc, see paint for reference
BLD19-01828 BLD-Wall Bracing8/28/20198/29/20198/29/2019 12:15:51 PMAPEND
late AM // stem wall rebar // Mike Phone #: ###-####,, foundation pending special inspections
BLD19-01976 BLD-Footing8/28/20198/29/20198/29/2019 11:47:07 AMAPASS
Noah Phone #: ###-####
BLD18-04282 BLD-Final8/28/20198/29/20198/29/2019 11:31:20 AMAPASS
Ready for a final inspection.
As per requested, handrail is installed, smoke alarm has been replaced with combo smoke/carbon monoxide detector and deck post bases are fully nailed. Phone #: ###-#### Inspection requested via web by Michael Barrie// c of o issued
BLD18-04282 DOC - Permit Finaled8/29/20198/29/20198/29/2019 11:30:05 AMPPASS
BLD19-00283 BLD-Foundation8/28/20198/29/20198/29/2019 8:25:27 AMADONE
Noah; Phone #: ###-####