BLD18-03119
| BLD-Aging Inspection | 8/9/2019 | 8/9/2019 | 8/14/2019 1:46:40 PM | | PEND |
|
|
|
BLD18-04405
| BLD-Aging Inspection | 8/9/2019 | 8/9/2019 | 8/14/2019 1:46:17 PM | | DONE |
|
|
|
BLD18-03301
| BLD-Aging Inspection | 8/9/2019 | 8/9/2019 | 8/14/2019 1:45:58 PM | | PEND |
|
|
|
MIS18-00367
| MIS-Aging Inspection | 8/9/2019 | 8/9/2019 | 8/13/2019 2:54:52 PM | | DONE |
|
|
|
BLD19-00449
| BLD-Aging Inspection | 8/9/2019 | 8/9/2019 | 8/13/2019 1:18:06 PM | | PEND |
|
|
|
MIS19-00222
| BLD-Conference | 8/8/2019 | 8/9/2019 | 8/12/2019 1:18:56 PM | P | PEND |
|
|
Possible work without permits// status review,, owner Steve said he would get the permit on the 28th,, ###-####
|
BLD19-01278
| BLD-Wall cover | 8/9/2019 | 8/9/2019 | 8/9/2019 4:41:15 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford,, insulation work in progress,, not ready
|
BLD18-03518
| BLD-Blower Door Test Results | 8/9/2019 | 8/9/2019 | 8/9/2019 4:40:01 PM | P | DONE |
|
|
4.62
|
BLD19-01519
| BLD-Framing/Rough-in | 8/9/2019 | 8/9/2019 | 8/9/2019 4:38:17 PM | P | PASS |
|
|
kevin Phone #: ###-####
|
BLD18-03518
| BLD-Final | 8/8/2019 | 8/9/2019 | 8/9/2019 3:47:57 PM | P | PASS |
|
|
Gene; Phone #: ###-####
|
BLD18-03518
| DOC - Permit Finaled | 8/9/2019 | 8/9/2019 | 8/9/2019 3:47:41 PM | P | PASS |
|
|
|
BLD19-01777
| BLD-Footing | 8/8/2019 | 8/9/2019 | 8/9/2019 3:24:13 PM | P | PART |
|
|
Mark- pouring schedule is at 3pm Phone #: ###-####,, garages footings ok,, set backs appear ok
|
MIS19-00240
| BLD-Conference | 8/9/2019 | 8/9/2019 | 8/9/2019 3:23:20 PM | P | PEND |
|
|
complaints about a wall being building on top of a pergola with no permits,, met owner,, he will check with Colleen in zoning,, called Josh to see about permit and left a message..
|
BLD19-01000
| BLD-Framing/Rough-in | 8/9/2019 | 8/9/2019 | 8/9/2019 3:17:41 PM | P | PART |
|
|
Mark Phone #: ###-####-please call 30 minutes prior to meet for access,, met framer, builder on site,, c/n posted,, needs fix on sprinkler in the front entry area,, needs freeze protection,, shear wall fixes, straps on shear, header as needed, brace trusses as needed,, nail braces as needed,, ok to insulate
|
BLD19-00417
| BLD-Framing/Rough-in | 8/8/2019 | 8/9/2019 | 8/9/2019 1:45:59 PM | A | NR |
|
|
Andrew Phone #: ###-####
|
MIS18-00365
| DOC - Permit Expired | 8/9/2019 | 8/9/2019 | 8/9/2019 1:25:24 PM | P | FAIL |
|
|
|
BLD18-04405
| DOC - Permit Finaled | 8/9/2019 | 8/9/2019 | 8/9/2019 1:23:11 PM | P | PASS |
|
|
|
BLD19-02215
| BLD-Final | 8/8/2019 | 8/9/2019 | 8/9/2019 1:22:04 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Hoyne// c of c issued
|
BLD19-02215
| DOC - Permit Finaled | 8/9/2019 | 8/9/2019 | 8/9/2019 1:18:34 PM | P | PASS |
|
|
|
BLD18-00944
| BLD-Final | 8/8/2019 | 8/9/2019 | 8/9/2019 12:43:27 PM | A | PASS |
|
|
KURT Phone #: ###-####
|
BLD19-01000
| BLD-Framing/Rough-in | 8/8/2019 | 8/9/2019 | 8/9/2019 12:14:26 PM | A | NR |
|
|
Mark Phone #: ###-####-please call 30 minutes prior to meet for access,, needs plans, truss layout
|
BLD19-01267
| BLD-Footing | 8/8/2019 | 8/9/2019 | 8/9/2019 9:12:42 AM | A | NR |
|
|
Rod- rebar inspection Phone #: ###-####,, needs ele permit,, soils approval
|
BLD18-00670
| BLD-Conference | 8/8/2019 | 8/9/2019 | 8/9/2019 9:11:24 AM | A | PART |
|
|
Clayton Phone #: ###-####,, walk through for final,, needs, hillside PW approval, guard rail interior, letter of approval on cable guard rails, general other items
|
BLD19-00658
| BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 9:07:59 AM | A | PEND |
|
|
rebar // Izaak Phone #: ###-####,, pending S, I. report
|