Inspections for the day of: Wednesday, September 11, 2019.
Number of inspections: 36
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04582 BLD-Aging Inspection9/11/20199/11/20199/13/2019 2:55:18 PM PEND
BLD19-00185 BLD-Blower Door Test Results9/11/20199/11/20199/11/2019 6:37:28 PMPPEND
Wes Phone #: ###-#### PLEASE call for access
BLD19-00185 BLD-Final9/11/20199/11/20199/11/2019 6:36:05 PMPPART
Wes Phone #: ###-#### PLEASE call for access// all ok ,, just need the blower door test results
BLD18-04157 BLD-Blower Door Test Results9/11/20199/11/20199/11/2019 6:24:24 PMPPASS
We decided not to do the decorative awning over the front door. The rest of the corrections have been done. Thank you. Phone #: ###-#### Inspection requested via web by Scott Asin
BLD18-04157 BLD-Final9/10/20199/11/20199/11/2019 6:22:54 PMPPASS
We decided not to do the decorative awning over the front door. The rest of the corrections have been done. Thank you. Phone #: ###-#### Inspection requested via web by Scott Asin
BLD18-04157 DOC - Permit Finaled9/11/20199/11/20199/11/2019 6:22:21 PMPPASS
c of o issued,, awning is removed from the plan per contractor
BLD19-02882 BLD-Framing/Rough-in9/11/20199/11/20199/11/2019 6:05:57 PMPPART
Michael Phone #: ###-####,, fire block top of new chase/soffit,, maintain firewall seperation
BLD19-00549 BLD-Blower Door Test Results9/11/20199/11/20199/11/2019 5:26:13 PMPDONE
4.38
BLD19-00549 DOC - Permit Finaled9/11/20199/11/20199/11/2019 5:24:02 PMPPASS
BLD19-00126 BLD-Final9/10/20199/11/20199/11/2019 5:22:55 PMAPASS
Dale Phone #: ###-####//
c of c issued
BLD19-00549 BLD-Final9/11/20199/11/20199/11/2019 5:22:55 PMPPASS
c of o issued
BLD19-00126 DOC - Permit Finaled9/11/20199/11/20199/11/2019 5:22:12 PMPPASS
BLD19-03122 BLD-Footing9/10/20199/11/20199/11/2019 4:41:07 PMPPART
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru// poured
BLD18-02497 BLD-Ceiling Grid Inspection9/11/20199/11/20199/11/2019 4:39:38 PMPPASS
Ken Phone #: ###-####
BLD19-01635 BLD-Final9/10/20199/11/20199/11/2019 4:38:35 PMANH
wanted temp c of o // Steve Phone #: ###-####
BLD18-03807 BLD-Final9/10/20199/11/20199/11/2019 4:28:46 PMPPART
Todd Phone #: ###-####,, temp occupancy ok,, needs accessibility requirements,, plans don't show all
BLD18-03764 BLD-Final9/10/20199/11/20199/11/2019 4:26:40 PMPPART
Todd Phone #: ###-####,,, plans only show 1 handrail?,, call into plan review for verification
BLD19-00658 BLD-Foundation9/11/20199/11/20199/11/2019 3:05:50 PMPPART
rebar // josh Phone #: ###-####,, pending special inspection
BLD19-01878 BLD-Conference9/11/20199/11/20199/11/2019 3:05:06 PMAPASS
Follow-up from yesterday r.e. fire wall and framing. Phone #: ###-#### Inspection requested via web by Greg Stahl// needs 5/8th on exterior on south side
BLD18-03756 BLD-Energy code compliance9/11/20199/11/20199/11/2019 2:37:26 PMPCANC
Brett-had part insp Phone #: ###-####
BLD18-03439 BLD-Final9/11/20199/11/20199/11/2019 2:36:54 PMPNR
Please contact Brett Ogata, 30 minutes prior to arrival.
Thank you!
Phone #: ###-#### Inspection requested via web by Cara Heisey// needs trades,, historical 1st
BLD18-03756 BLD-Final9/11/20199/11/20199/11/2019 2:35:50 PMPCANC
Brett Phone #: ###-####
BLD18-03756 BLD-Framing/Rough-in9/11/20199/11/20199/11/2019 2:35:36 PMPNR
Brett-had part insp Phone #: ###-####// needs trades, historical
BLD19-03213 BLD-Other9/10/20199/11/20199/11/2019 1:48:56 PMAPASS
Rebar Inspection Phone #: ###-#### Inspection requested via web by Raquel Kenley,, set backs appear to be per approved plan
BLD19-03053 BLD-Footing9/10/20199/11/20199/11/2019 1:46:48 PMAPART
Ryan Phone #: ###-####,, basement footings ok after digging out to 14" thick all the way,,
BLD18-04078 BLD-Final9/10/20199/11/20199/11/2019 12:10:09 PMANR
Colby Phone #: ###-####,, needs electrical final 1st
BLD19-00713 BLD-Conference9/10/20199/11/20199/11/2019 12:08:38 PMAPASS
Sherly Phone #: ###-####
BLD19-00713 DOC - Permit Finaled9/11/20199/11/20199/11/2019 12:08:23 PMPPASS
BLD19-00713 BLD-Final9/11/20199/11/20199/11/2019 12:08:14 PMPCANC
Sherly Phone #: ###-####
BLD19-02661 BLD-Footing9/10/20199/11/20199/11/2019 11:58:26 AMAPART
Edgar Phone #: ###-####,, ok,, will get footing protection before final
BLD19-01653 BLD-Framing/Rough-in9/10/20199/11/20199/11/2019 11:41:14 AMAPART
Wes Phone #: ###-####,, needs egress in master and bedroom #3,, nail hanger in kitchen above slider door, seal holes in plate line by stairs,, ok to inulate,, ok to start soffits
BLD19-00549 BLD-Final9/10/20199/11/20199/11/2019 11:02:24 AMANH
Craig Phone #: ###-####,, locked
BLD19-01944 BLD-Energy code compliance9/10/20199/11/20199/11/2019 10:30:09 AMAPASS
Kevin Phone #: ###-####
BLD18-03295 DOC - Permit Expired8/1/20199/11/20199/11/2019 10:28:34 AMAPASS
BLD19-02524 BLD-Wall Bracing9/10/20199/11/20199/11/2019 10:26:56 AMAPART
Call to meet there // shear // Matt Phone #: ###-####,, exterior ok after renailing per plan,, floor joists ok to cover pend trades on old garage slab,, insulation ok
BLD18-03790 BLD-Final9/10/20199/11/20199/11/2019 12:00:00 AMACANC
per Cara cancel final will call later to reschedule

Please call Cara, 30 minutes prior to arrival.
Thank you! Phone #: ###-#### >> Inspection requested via web by Bret