Inspections for the day of: Wednesday, September 18, 2019.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02977 BLD-Aging Inspection9/18/20199/18/20199/20/2019 11:26:45 AM PEND
BLD19-00419 BLD-Aging Inspection9/18/20199/18/20199/20/2019 10:10:28 AM PEND
BLD18-03119 BLD-Final9/13/20199/18/20199/19/2019 12:52:22 PMPDONE
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.

Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.

If all goes well, we are hoping to move in this weekend.

Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
BLD19-00796 BLD-Final9/18/20199/18/20199/18/2019 3:46:12 PMPDONE
Chris Phone #: ###-####
BLD19-00796 DOC - Permit Finaled9/18/20199/18/20199/18/2019 3:46:04 PMPPASS
done per letter from engineer
BLD19-00043 BLD-Other9/16/20199/18/20199/18/2019 3:16:48 PMANH
Mika Phone #: ###-####,, no answer on phone either
BLD19-00185 BLD-Blower Door Test Results9/17/20199/18/20199/18/2019 3:07:33 PMPDONE
Wes Phone #: ###-#### PLEASE call for access// 4.2
BLD19-00185 BLD-Final9/17/20199/18/20199/18/2019 3:07:15 PMPPASS
Wes Phone #: ###-#### PLEASE call for access
BLD19-00185 DOC - Permit Finaled9/18/20199/18/20199/18/2019 3:07:07 PMPPASS
MIS19-00306 Set Bond Amount9/18/20199/18/20199/18/2019 2:30:20 PMPDONE
Tim Phone #: ###-####// recomend a $1000 bond
BLD18-03129 BLD-Conference9/17/20199/18/20199/18/2019 2:20:30 PMPDONE
Call about possible work being done differently then what is on approved plans and being to close to property line// talked to the contractor,, sounds like a surveyer will shoot in the building
BLD18-01175 BLD-Blower Door Test Results9/17/20199/18/20199/18/2019 2:14:32 PMPDONE
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner/// 1.9
BLD18-01175 DOC - Permit Finaled9/18/20199/18/20199/18/2019 2:14:07 PMPPASS
c of o issued
BLD18-01175 BLD-Final9/17/20199/18/20199/18/2019 2:13:29 PMPPASS
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner// glazing by front door is one piece per contractor/ window rep and has acid etch on bottom.. ok
BLD18-03119 BLD-Blower Door Test Results9/13/20199/18/20199/18/2019 2:10:29 PMPNR
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.

Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.

If all goes well, we are hoping to move in this weekend.

Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
BLD19-03338 BLD-Final9/18/20199/18/20199/18/2019 2:00:55 PMPDONE
joel Phone #: ###-####// done,, gone
BLD19-03338 DOC - Permit Finaled9/18/20199/18/20199/18/2019 2:00:49 PMPPASS
BLD19-02155 BLD-Energy code compliance9/17/20199/18/20199/18/2019 12:51:40 PMAPART
Jim Phone #: ###-####,, insulation ok but need an mechanical inspector to re-look at the B vent due to possible clearance issues// I will schedule a follow up after
BLD19-00550 BLD-Final9/17/20199/18/20199/18/2019 12:00:39 PMAPASS
Craig Phone #: ###-####// c/n made ok per plan review
BLD19-00550 DOC - Permit Finaled9/18/20199/18/20199/18/2019 12:00:18 PMPPASS
BLD19-00550 BLD-Blower Door Test Results9/18/20199/18/20199/18/2019 11:55:08 AMPDONE
Craig Phone #: ###-####/// 3.8
BLD19-03369 BLD-Footing9/17/20199/18/20199/18/2019 11:37:35 AMANR
Inspection is for rebar in swimming pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post near the pool equipment. If you have any questions please don''t hesitate to call. Thank you Phone #: ###-#### Inspection requested via web by Brandy McConkey// needs electrical pass 1st,, needs clearance from soils/rebar,, need to remove all roots and debris
BLD19-00796 BLD-Conference9/16/20199/18/20199/18/2019 10:14:16 AMAPASS
Chris Phone #: ###-####.. plan reviewer recieved engineer letter.. filed to records
BLD19-03415 BLD-Final9/17/20199/18/20199/18/2019 9:11:19 AMADONE
Phone #: ###-####// per plan,, appears that the p/l is 3 foot beyond fence
BLD19-03415 DOC - Permit Finaled9/18/20199/18/20199/18/2019 9:11:09 AMPPASS
MIS19-00222 BLD-Final9/17/20199/18/20199/18/2019 9:09:39 AMADONE
permit issued
MIS19-00222 DOC - Permit Finaled9/18/20199/18/20199/18/2019 9:09:21 AMPPASS