Inspections for the day of: Friday, September 21, 2018.
Number of inspections: 19
Percentage of inspections complete: 79 %
Percentage of inspections not complete: 21 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00365 BLD-Conference9/17/20189/20/2018 P 
possible work without permits// status review
BLD18-00120 BLD-Final9/20/20189/21/20189/21/2018 3:29:52 PMPPASS
Kevin ; Phone #: ###-####
BLD18-00120 DOC - Permit Finaled9/21/20189/21/20189/21/2018 3:29:43 PMPPASS
BLD18-02681 BLD-Framing/Rough-in9/21/20189/21/20189/21/2018 3:02:00 PMPPART
Remi Phone #: ###-####,, ok to cover after fixes
BLD18-01839 BLD-Wall Bracing9/20/20189/21/20189/21/2018 2:55:44 PMPPASS
Phone #: ###-#### Inspection requested via web by Jessica Bradley
BLD18-01393 BLD-Other9/21/20189/21/20189/21/2018 2:42:12 PMPPART
sheetrock outside- Phil Phone #: ###-####,, work in progress,, ok
BLD18-02681 BLD-Framing/Rough-in9/20/20189/21/20189/21/2018 2:29:15 PMAPART
Remi Phone #: ###-####,, seal holes,, ok
BLD18-02811 BLD-Energy code compliance9/20/20189/21/20189/21/2018 2:15:31 PMPPASS
Gavin (husband) Phone #: ###-####
BLD18-02141 BLD-Framing/Rough-in9/21/20189/21/20189/21/2018 1:56:50 PMPPART
Larry Phone #: ###-####,, see paint,, tighten all nuts in the sill plate bolts,, seal holes in the plates,, add hanger on upstairs hip ridge jack,, fire block the double wall top plates,, (can be insulation),, see paint,, will need one more tenting inspection from the sprinkler inspector prior to energy code passing for cover,, ok to insulate after fixes
BLD18-02085 BLD-Framing/Rough-in9/20/20189/21/20189/21/2018 12:46:57 PMAPASS
Call Jim Kirk, ###-####, if any questions. Phone #: ###-#### Inspection requested via web by John Johnston
BLD16-02861 BLD-Conference9/20/20189/21/20189/21/2018 11:21:24 AMAPASS
Ana Phone #: ###-####,, general walk through,, ok
MIS18-00343 BLD-Conference9/18/20189/21/20189/21/2018 11:03:59 AMAPEND
status// still waiting
BLD18-00698 BLD-Final9/20/20189/21/20189/21/2018 11:02:29 AMAPASS
Charlie Phone #: ###-####
BLD18-00698 DOC - Permit Finaled9/21/20189/21/20189/21/2018 11:02:19 AMPPASS
BLD18-03051 BLD-Energy code compliance9/20/20189/21/20189/21/2018 10:39:00 AMAPASS
Bill Phone #: ###-####
BLD17-03786 BLD-Final9/19/20189/21/20189/21/2018 10:28:42 AMAFAIL
Jay Phone #: ###-####,, still needs hand rail off the back
MIS18-00367 BLD-Conference9/18/20189/21/2018 A 
building garage w/o permits// status*****Steve Noseworthy came in 10/8/18 to let us know he is reducing the size of his garage to under 200 sq ft-will start reducing the size but probably will not do this until spring when he can get the concrete done***
BLD17-04396 BLD-Final9/20/20189/21/2018 P 
Phone #: ###-#### >> Inspection requested via web by joey benart
BLD18-01179 BLD-Final9/20/20189/21/2018 P 
Kent Phone #: ###-####