Inspections for the day of: Tuesday, September 3, 2019.
Number of inspections: 18
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00253 BLD-Conference8/23/20198/27/2019 P 
status review
BLD19-02125 BLD-Conference8/30/20199/3/20199/4/2019 11:13:45 AMAPEND
email complaint: "The house across the alley from me is being rehabbed - up on girders, basement being dug. I wanted to express my concerns about how close the work vehicles are coming to our house. Our house is located at 511 Sherman Street and sits very close to the alley across from the rehab project. Is there a way to require the machinery to stay on their property? Last night I found that a large (over 6 ft tall) pile of dirt had spilled into the alley last night, which means that today''s trash/recycle trucks will be veering even closer to our house. And there have been heavy tire tracks right next to our front porch. It there any way for the City to require them to access the property from a spot that is less threatening to the neighbors'' properties? Thank you for your help. p.s. Are they not required to have any sort of erosion control BMPs? " Phone #: ###-####/// talked with excavator person,, went over issues,, told to clean up and get bmp's in place,, called RP,, left v.mail same,, he called back and said he would take care of it,, ESC personnel will follow up
BLD19-00785 BLD-Foundation9/3/20199/3/20199/3/2019 5:19:28 PMPDONE
Bill Phone #: ###-####
BLD19-00045 BLD-Final9/3/20199/3/20199/3/2019 4:49:00 PMPFAIL
Dillon Phone #: ###-####,, needs window fall protection
BLD19-00045 BLD-Blower Door Test Results9/3/20199/3/20199/3/2019 4:48:37 PMPDONE
Dillon Phone #: ###-####,, 3.08
BLD19-02587 BLD-Footing8/30/20199/3/20199/3/2019 4:24:46 PMAPART
Dion Phone #: ###-####,, new post footings ok
BLD19-01523 BLD-Energy code compliance9/3/20199/3/20199/3/2019 4:04:50 PMPPASS
Ron Phone #: ###-####,, rear wall was re-built,, ok now re-insulating the rim area
BLD19-01522 BLD-Energy code compliance9/3/20199/3/20199/3/2019 4:01:00 PMPPASS
Ron Phone #: ###-####
BLD19-02968 BLD-Footing9/3/20199/3/20199/3/2019 3:54:23 PMPNR
Liza Phone #: ###-####
BLD18-02064 BLD-Energy code compliance9/3/20199/3/20199/3/2019 2:57:25 PMPPASS
Mark Phone #: ###-####
BLD17-03394 BLD-Final9/3/20199/3/20199/3/2019 2:35:41 PMPNR
Gim Phone #: ###-####
BLD19-02468 BLD-Framing/Rough-in9/3/20199/3/20199/3/2019 2:34:32 PMPDEFR
Danny Phone #: ###-####,, needs mech
BLD18-04209 BLD-Foundation8/30/20199/3/20199/3/2019 11:51:14 AMAPART
Chris Phone #: ###-####,, work in progress,, appears ok
BLD19-02468 BLD-Framing/Rough-in8/30/20199/3/20199/3/2019 11:10:10 AMANR
Danny Phone #: ###-####,, needs trades passed
BLD19-03182 BLD-Conference8/30/20199/3/20199/3/2019 11:06:25 AMAPART
Fernando Phone #: ###-####.. ? about the gutter drain pipe next to the footing.. general look at the job,, ok,, drain pipe not affecting
BLD19-02504 BLD-Final8/30/20199/3/20199/3/2019 10:50:01 AMAPASS
Eric Phone #: ###-####
BLD19-02504 DOC - Permit Finaled9/3/20199/3/20199/3/2019 10:49:40 AMPPASS
BLD19-02654 BLD-Framing/Rough-in8/30/20199/3/20199/3/2019 12:00:00 AMPCANC
Bob Phone #: ###-####