ESC09-00812
| Site Preparation | 2/10/2010 | 2/12/2010 | 2/12/2010 3:15:53 PM | P | PART |
|
|
Walk site with C. Smith: Reviewed site plan with Walt from McAlvain, not ready to approve the start of de-watering, pipe is connected to the pumps but trench construction is just underway. Reviewed pond #2 and 3, should be adequate volume to handle discharge. Inspector #460 will follow up on Tuesday, Feb. 16th. Reminded Walt that trench needs to be lined not bare soil.
|
ESC39-00001
| Site Preparation | 2/12/2010 | 2/12/2010 | 2/12/2010 7:47:36 AM | | CANC |
|
|
Sample inspection
|
ESC10-00039
| Site Preparation | 2/12/2010 | 2/12/2010 | 2/12/2010 7:47:15 AM | | CANC |
|
|
Already performed yesterday by Inspector 408
|