Inspections for the day of: Friday, January 3, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04124 BLD-Aging Inspection1/3/20201/3/20201/6/2020 12:17:37 PM PASS
BLD19-03918 BLD-Concrete1/3/20201/3/20201/6/2020 10:33:51 AMPPEND
SOG - ramp to mini ramp. Grids P4 - P9 Phone #: ###-#### Inspection requested via web by Garrett Camp
BLD19-04703 BLD-Footing1/2/20201/3/20201/3/2020 3:26:06 PMPPASS
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD19-04696 BLD-Footing1/2/20201/3/20201/3/2020 3:25:54 PMPPASS
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD19-04032 BLD-Framing/Rough-in1/3/20201/3/20201/3/2020 3:25:29 PMPPASS
Phone #: ###-#### Inspection requested via web by Kai Duncan
BLD19-01957 BLD-Energy code compliance12/31/20191/3/20201/3/2020 2:56:19 PMPPASS
david Phone #: ###-####
BLD19-02302 BLD-Wall Bracing1/3/20201/3/20201/3/2020 1:49:23 PMPPASS
BLD19-02302 BLD-Framing/Rough-in1/3/20201/3/20201/3/2020 11:16:20 AMAPASS
Phone #: ###-#### Inspection requested via web by Joseph knight
BLD19-01310 BLD-Final1/2/20201/3/20201/3/2020 9:58:52 AMAPASS
Eric (said you just needed paperwork to sign off) Phone #: ###-####
BLD19-04237 BLD-Wall Bracing1/2/20201/3/20201/3/2020 9:11:51 AMAFAIL
Plans are located in the conduit tube in the garage by the stairs. Shear details on 2.0, 2.1 and 2.2. There is a page stapled on 2.2 from engineer showing the nailing pattern. Please call with questions.
Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor bldg shear was stapled not nailed as per engineering need ok from enginer
BLD19-04067 BLD-Wall Bracing1/2/20201/3/20201/3/2020 8:52:01 AMANR
Phone #: ###-#### Inspection requested via web by James Jackson no plans on site