BLD18-01532
| BLD-Final | 11/1/2018 | 11/1/2018 | | P | |
|
|
Manny Phone #: ###-####
|
MIS18-00429
| BLD-Conference | 11/8/2018 | 11/8/2018 | 11/9/2018 7:18:09 AM | P | NH |
|
|
Extensive fire damage - to verify structural integrity and containment Phone #: ###-####-Dave went out to do inspection but it's all boarded up with no trespassing signs-couldn't do inspection cant access house
|
BLD16-04256
| BLD-Final | 11/8/2018 | 11/8/2018 | 11/9/2018 7:17:27 AM | P | NR |
|
|
Sherri Phone #: ###-#### needs handrail temp glass at door landindg and smoke det
|
BLD18-03865
| BLD-Framing/Rough-in | 11/7/2018 | 11/8/2018 | 11/9/2018 7:16:07 AM | P | PASS |
|
|
Sherri Phone #: ###-####
|
BLD17-02757
| BLD-Framing/Rough-in | 11/6/2018 | 11/8/2018 | 11/9/2018 7:15:46 AM | P | PASS |
|
|
interior framing level-3 ; 4; exterior framing and shaft walls level-4 Phone #: ###-#### Inspection requested via web by Jamal Nelson
|
BLD18-03258
| BLD-Footing | 11/8/2018 | 11/8/2018 | 11/8/2018 1:39:58 PM | P | PASS |
|
|
Matt Phone #: ###-####
|
BLD16-02008
| BLD-Conference | 11/8/2018 | 11/8/2018 | 11/8/2018 1:12:34 PM | P | DONE |
|
|
Would like to review ESI''s TCO plan in the office. Also would like to walk Level 3,4 and 5 for Pre-Final walk. Please call me before heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD18-01031
| BLD-Final | 11/7/2018 | 11/8/2018 | 11/8/2018 11:59:53 AM | A | PART |
|
|
Dan Phone #: ###-#### grid ok but needs to finish fire walls
|
BLD18-03834
| BLD-Footing | 11/7/2018 | 11/8/2018 | 11/8/2018 9:44:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by eric steiner
|
BLD16-04256
| BLD-Final | 11/7/2018 | 11/8/2018 | 11/8/2018 9:43:54 AM | A | CANC |
|
|
Sherri Phone #: ###-####
|
BLD18-00684
| BLD-Framing/Rough-in | 11/7/2018 | 11/8/2018 | 11/8/2018 8:33:00 AM | A | PASS |
|
|
Al Phone #: ###-####
|