BLD18-01080
| BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/21/2019 6:46:17 AM | P | NR |
|
|
Steve-Charles hired GC-he''s calling in the inspections Phone #: ###-#### needs to fire caulk install draft stops in attic fix i joist cut by plumber
|
BLD17-02757
| BLD-Ceiling Grid Inspection | 2/18/2019 | 2/20/2019 | 2/21/2019 6:41:24 AM | P | PASS |
|
|
Ceiling grid inspection level 1-2; approval to place ceiling tile. Please call Jamal Nelson, 5min prior to arrival - thank you. Phone #: ###-#### Inspection requested via web by Jamal Nelson
|
BLD18-04500
| BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/20/2019 2:53:54 PM | P | PEND |
|
|
Jason Phone #: ###-#### needs air seal and fire blocking and fix floor joist cut by plumbing
|
BLD17-02262
| BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/20/2019 2:51:28 PM | P | PART |
|
|
Area D First Floor unit ceilings for insulation and drywall cover. Exterior walls as well. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate ext walls and ceiling bldg d
|
BLD17-04464
| BLD-Framing/Rough-in | 2/19/2019 | 2/20/2019 | 2/20/2019 10:09:57 AM | A | PASS |
|
|
Framing inspection prior to insulation in units #102, #104 #106, #108, #110, #202, #204 Phone #: ###-#### Inspection requested via web by Hunter Gomez
|
BLD18-00248
| BLD-Footing | 2/19/2019 | 2/20/2019 | 2/20/2019 10:09:42 AM | A | PASS |
|
|
Footing Rebar inspection for wall footing and pad footings. Early AM if possible (Weather permitting 10 AM Concrete pour scheduled) Phone #: ###-#### Inspection requested via web by Hunter Gomez
|
BLD17-04219
| BLD-Footing | 2/19/2019 | 2/20/2019 | 2/20/2019 10:09:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cameron Brown
|