Inspections for the day of: Wednesday, February 20, 2019.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01080 BLD-Framing/Rough-in2/20/20192/20/20192/21/2019 6:46:17 AMPNR
Steve-Charles hired GC-he''s calling in the inspections Phone #: ###-#### needs to fire caulk install draft stops in attic fix i joist cut by plumber
BLD17-02757 BLD-Ceiling Grid Inspection2/18/20192/20/20192/21/2019 6:41:24 AMPPASS
Ceiling grid inspection level 1-2; approval to place ceiling tile. Please call Jamal Nelson, 5min prior to arrival - thank you. Phone #: ###-#### Inspection requested via web by Jamal Nelson
BLD18-04500 BLD-Framing/Rough-in2/20/20192/20/20192/20/2019 2:53:54 PMPPEND
Jason Phone #: ###-#### needs air seal and fire blocking and fix floor joist cut by plumbing
BLD17-02262 BLD-Framing/Rough-in2/20/20192/20/20192/20/2019 2:51:28 PMPPART
Area D First Floor unit ceilings for insulation and drywall cover. Exterior walls as well. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate ext walls and ceiling bldg d
BLD17-04464 BLD-Framing/Rough-in2/19/20192/20/20192/20/2019 10:09:57 AMAPASS
Framing inspection prior to insulation in units #102, #104 #106, #108, #110, #202, #204 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD18-00248 BLD-Footing2/19/20192/20/20192/20/2019 10:09:42 AMAPASS
Footing Rebar inspection for wall footing and pad footings. Early AM if possible (Weather permitting 10 AM Concrete pour scheduled) Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD17-04219 BLD-Footing2/19/20192/20/20192/20/2019 10:09:26 AMAPASS
Phone #: ###-#### Inspection requested via web by Cameron Brown