BLD16-02008
| BLD-Framing/Rough-in | 2/28/2018 | 2/28/2018 | 3/1/2018 6:18:23 AM | A | PART |
|
|
Framing walk 2nd floor. Ongoing. Call Adam when heading to site. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD17-00583
| BLD-Other | 2/28/2018 | 2/28/2018 | 3/1/2018 6:18:00 AM | A | PASS |
|
|
Com room inspecting fire caulk for insulation and drywall Phone #: ###-#### Inspection requested via web by David Banks
|
BLD17-02059
| BLD-Final | 2/26/2018 | 2/28/2018 | 3/1/2018 6:17:45 AM | P | PASS |
|
|
Install 2 park signs 1 in alley way and one on corner of alley and Myrtle. Install 1 sidewalk sign on Capitol. All Primary Power by Others Phone #: ###-#### Inspection requested via web by Ken Olsen
|
BLD17-03828
| BLD-Framing/Rough-in | 2/27/2018 | 2/28/2018 | 3/1/2018 6:17:05 AM | P | PASS |
|
|
Doug Phone #: ###-####
|
BLD18-00274
| BLD-Framing/Rough-in | 2/27/2018 | 2/28/2018 | 3/1/2018 6:16:44 AM | P | PASS |
|
|
Jaman Phone #: ###-####
|
BLD17-03726
| DOC - Permit Finaled | 2/28/2018 | 2/28/2018 | 2/28/2018 2:37:57 PM | P | PASS |
|
|
|
BLD17-04584
| BLD-Conference | 2/27/2018 | 2/28/2018 | 2/28/2018 9:43:39 AM | A | DONE |
|
|
Fire wall // Daryl Phone #: ###-####
|
BLD17-00972
| BLD-Framing/Rough-in | 2/27/2018 | 2/28/2018 | 2/28/2018 8:41:19 AM | A | PASS |
|
|
Jade Phone #: ###-####
|
BLD17-03614
| BLD-Footing | 2/27/2018 | 2/28/2018 | 2/27/2018 2:05:02 PM | P | CANC |
|
|
Special Inspector scheduled as well Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
BLD18-00330
| BLD-Footing | 2/27/2018 | 2/28/2018 | 2/27/2018 11:44:47 AM | A | PASS |
|
|
- Chris Phone #: ###-####
|