BLD17-02326
| DOC - Permit Finaled | 3/23/2018 | 3/23/2018 | 3/23/2018 3:53:57 PM | P | PASS |
|
|
|
BLD18-00323
| BLD-Conference | 3/23/2018 | 3/23/2018 | 3/23/2018 3:40:42 PM | P | DONE |
|
|
Todd Phone #: ###-####
|
BLD18-00728
| BLD-Wall Bracing | 3/22/2018 | 3/23/2018 | 3/23/2018 3:40:30 PM | A | PASS |
|
|
Brandon Phone #: ###-#### wants both footing and wall inspections at same time
|
BLD18-00728
| BLD-Footing | 3/22/2018 | 3/23/2018 | 3/23/2018 3:40:19 PM | A | PASS |
|
|
Brandon Phone #: ###-####
|
BLD17-03402
| BLD-Wall Bracing | 3/23/2018 | 3/23/2018 | 3/23/2018 3:40:08 PM | P | PASS |
|
|
Shear // Brian Phone #: ###-####
|
BLD17-03405
| BLD-Wall Bracing | 3/23/2018 | 3/23/2018 | 3/23/2018 3:39:55 PM | P | PASS |
|
|
Shear // Brian Phone #: ###-####
|
MIS18-00100
| BLD-Conference | 3/23/2018 | 3/23/2018 | 3/23/2018 9:54:19 AM | A | DONE |
|
|
replacing windows without pemits stop work issued
|
BLD16-04593
| BLD-Framing/Rough-in | 3/22/2018 | 3/23/2018 | 3/23/2018 8:41:16 AM | A | NR |
|
|
Carrie Phone #: ###-#### needs mec rough in first
|
BLD16-04593
| BLD-Energy code compliance | 3/22/2018 | 3/23/2018 | 3/23/2018 8:40:10 AM | A | PART |
|
|
Carrie Phone #: ###-#### air seal ok
|