BLD18-03143
| BLD-Wall cover | 3/25/2020 | 3/25/2020 | 3/26/2020 10:17:04 AM | P | PASS |
|
|
Hotel, Level 3 insulation for cover. Level 4 putty packs, pre insulation. Thanks, AKJ. Call adam when heading to site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD19-03618
| BLD-Ceiling Grid Inspection | 3/24/2020 | 3/25/2020 | 3/26/2020 9:38:17 AM | P | PASS |
|
|
Bruce Phone #: ###-####
|
BLD20-00141
| BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 4:14:23 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Korey Hall needs to fire stop holes in floor
|
BLD19-03018
| BLD-Final | 3/25/2020 | 3/25/2020 | 3/25/2020 3:03:27 PM | P | PASS |
|
|
Erin Phone #: ###-####
|
BLD19-03018
| DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 3:03:17 PM | P | PASS |
|
|
|
BLD19-01946
| BLD-Conference | 3/25/2020 | 3/25/2020 | 3/25/2020 2:53:09 PM | P | DONE |
|
|
dUSTIN Phone #: ###-####
|
BLD19-02696
| BLD-Wall Bracing | 3/25/2020 | 3/25/2020 | 3/25/2020 2:26:39 PM | P | PASS |
|
|
Shear Phone #: ###-#### Inspection requested via web by Will Henggeler
|
BLD17-03010
| BLD-Final | 3/25/2020 | 3/25/2020 | 3/25/2020 2:15:48 PM | P | PASS |
|
|
Tim Phone #: ###-####
|
BLD19-02122
| BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 11:53:39 AM | A | PART |
|
|
Framing inspection on the north elevations. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD19-04407
| BLD-Energy code compliance | 3/24/2020 | 3/25/2020 | 3/25/2020 11:53:22 AM | A | PASS |
|
|
Clive Phone #: ###-####
|
BLD18-03672
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 10:42:33 AM | A | PART |
|
|
The house has been approved plumbing and electrical. The HVAC has been approved for the second floor. The builder is requesting approval to apply gypboard to the second floor only. A follow on inspection will be scheduled for later next week? or when the fireplace chimney flue is installed. The delivery of the flue pipe has been delayed. Phone #: ###-#### Inspection requested via web by John Cloninger ok to cover second floor
|
BLD19-03482
| BLD-Conference | 3/24/2020 | 3/25/2020 | 3/25/2020 10:11:02 AM | A | DONE |
|
|
Party wall ?s, please call ahead for access - Ron Phone #: ###-####
|
BLD19-04734
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 9:38:55 AM | A | NR |
|
|
Chad Phone #: ###-#### two red tags on window one r elec and one mec and i needs a full set of truss engin eering on site
|
BLD19-04846
| BLD-Conference | 3/24/2020 | 3/25/2020 | 3/25/2020 9:16:51 AM | A | PART |
|
|
Call when on the way // Brandon Phone #: ###-#### under floor framing ok
|
BLD19-02409
| BLD-Footing | 3/23/2020 | 3/25/2020 | 3/25/2020 9:09:30 AM | A | PASS |
|
|
call ahead to meet- Andrew Phone #: ###-####
|
BLD19-04698
| BLD-Footing | 3/23/2020 | 3/25/2020 | 3/24/2020 12:49:47 PM | P | PASS |
|
|
Concrete scheduled for 2:00 pm Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|