Inspections for the day of: Friday, May 17, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03667 BLD-Other5/16/20195/17/20195/20/2019 8:49:59 AMAPART
fire wall // Joe Phone #: ###-#### sheet rock behind ledger ok
BLD19-00639 BLD-Foundation5/16/20195/17/20195/20/2019 8:49:06 AMPPART
Justin-Please call for access Phone #: ###-#### 3rd floor ramp ok after spec inspection
BLD18-03990 BLD-Wall Bracing5/16/20195/17/20195/20/2019 8:48:14 AMPPEND
wall cast in place, W side // Brian Phone #: ###-#### ok after spec inspection
BLD19-00052 BLD-Final5/17/20195/17/20195/17/2019 3:52:56 PMPNR
HVAC final is scheduled for am. Please call me prior to heading that way. I will meet you ang get you access to the property.
Thanks. -Ryan Allen Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD19-00281 BLD-Final5/17/20195/17/20195/17/2019 3:52:29 PMPNR
As late as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
BLD18-02570 BLD-Final5/16/20195/17/20195/17/2019 1:25:35 PMPPASS
Call ahead // Jon Phone #: ###-####
BLD19-01702 BLD-Footing5/16/20195/17/20195/17/2019 10:46:13 AMAPASS
Call ahead // Gary Phone #: ###-####
BLD19-00769 BLD-Other5/16/20195/17/20195/17/2019 10:22:07 AMAPASS
stem wall // Ed Phone #: ###-####
BLD17-04219 BLD-Wall Bracing5/16/20195/17/20195/17/2019 10:13:42 AMAPASS
Inspection for Shear on exterior prior to installing Tyvek Phone #: ###-#### Inspection requested via web by Cameron Brown
BLD18-03814 BLD-Conference5/16/20195/17/20195/17/2019 8:55:59 AMAPASS
Keith Phone #: ###-####
BLD18-04493 BLD-Final5/16/20195/17/20195/17/2019 8:33:28 AMADONE
Larren Phone #: ###-####
BLD19-00551 BLD-Final5/16/20195/17/20195/17/2019 8:33:11 AMADONE
Larren Phone #: ###-####