BLD18-03990
| BLD-Foundation | 5/2/2019 | 5/3/2019 | 5/6/2019 9:31:44 AM | A | DONE |
|
|
west wall // Brian Phone #: ###-####
|
BLD17-02261
| BLD-Framing/Rough-in | 5/3/2019 | 5/3/2019 | 5/3/2019 4:20:19 PM | P | PASS |
|
|
|
BLD18-02750
| BLD-Final | 5/2/2019 | 5/3/2019 | 5/3/2019 4:20:06 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD19-00594
| BLD-Final | 5/2/2019 | 5/3/2019 | 5/3/2019 4:19:52 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD19-00679
| BLD-Final | 5/2/2019 | 5/3/2019 | 5/3/2019 2:01:32 PM | P | PASS |
|
|
Sarah-please do as late as possible becasue the fire life safety this this afternoon as well Phone #: ###-####
|
BLD19-00281
| BLD-Ceiling Grid Inspection | 5/2/2019 | 5/3/2019 | 5/3/2019 1:47:07 PM | P | PART |
|
|
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas second floor hallwal and conf rm ok to flood
|
BLD18-02803
| BLD-Energy code compliance | 5/2/2019 | 5/3/2019 | 5/3/2019 1:40:20 PM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD19-00202
| BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 11:32:42 AM | A | PASS |
|
|
Zack Phone #: ###-####
|
BLD18-03750
| BLD-Footing | 5/1/2019 | 5/3/2019 | 5/3/2019 10:51:04 AM | A | PASS |
|
|
Call ahead // Greg Phone #: ###-####
|
BLD18-01441
| BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 10:30:00 AM | A | PEND |
|
|
Blake Phone #: ###-#### framing ok but needs air seal done and fire blocking
|
BLD17-02261
| BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 10:29:04 AM | A | PEND |
|
|
First floor A units inspection for insulation. First Floor corridor A for fire caulk for secondary lid. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD18-03748
| BLD-Final | 5/2/2019 | 5/3/2019 | 5/3/2019 10:26:14 AM | A | NR |
|
|
Blake Phone #: ###-####
|
BLD19-00782
| BLD-Footing | 5/1/2019 | 5/3/2019 | 5/3/2019 10:00:51 AM | A | PASS |
|
|
Ren Phone #: ###-####
|