Inspections for the day of: Friday, May 3, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03990 BLD-Foundation5/2/20195/3/20195/6/2019 9:31:44 AMADONE
west wall // Brian Phone #: ###-####
BLD17-02261 BLD-Framing/Rough-in5/3/20195/3/20195/3/2019 4:20:19 PMPPASS
BLD18-02750 BLD-Final5/2/20195/3/20195/3/2019 4:20:06 PMPPASS
John Phone #: ###-####
BLD19-00594 BLD-Final5/2/20195/3/20195/3/2019 4:19:52 PMPPASS
John Phone #: ###-####
BLD19-00679 BLD-Final5/2/20195/3/20195/3/2019 2:01:32 PMPPASS
Sarah-please do as late as possible becasue the fire life safety this this afternoon as well Phone #: ###-####
BLD19-00281 BLD-Ceiling Grid Inspection5/2/20195/3/20195/3/2019 1:47:07 PMPPART
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas second floor hallwal and conf rm ok to flood
BLD18-02803 BLD-Energy code compliance5/2/20195/3/20195/3/2019 1:40:20 PMPPASS
Jim Phone #: ###-####
BLD19-00202 BLD-Framing/Rough-in5/2/20195/3/20195/3/2019 11:32:42 AMAPASS
Zack Phone #: ###-####
BLD18-03750 BLD-Footing5/1/20195/3/20195/3/2019 10:51:04 AMAPASS
Call ahead // Greg Phone #: ###-####
BLD18-01441 BLD-Framing/Rough-in5/2/20195/3/20195/3/2019 10:30:00 AMAPEND
Blake Phone #: ###-#### framing ok but needs air seal done and fire blocking
BLD17-02261 BLD-Framing/Rough-in5/2/20195/3/20195/3/2019 10:29:04 AMAPEND
First floor A units inspection for insulation. First Floor corridor A for fire caulk for secondary lid. Phone #: ###-#### Inspection requested via web by JT Turner
BLD18-03748 BLD-Final5/2/20195/3/20195/3/2019 10:26:14 AMANR
Blake Phone #: ###-####
BLD19-00782 BLD-Footing5/1/20195/3/20195/3/2019 10:00:51 AMAPASS
Ren Phone #: ###-####