BLD18-01166
| BLD-Footing | 6/27/2018 | 6/27/2018 | 6/28/2018 9:53:30 AM | P | PASS |
|
|
Steve Phone #: ###-####
|
BLD17-02377
| BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/28/2018 8:39:19 AM | P | CANC |
|
|
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-####
|
BLD18-01001
| BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 3:29:51 PM | P | PASS |
|
|
framing & shear reinsp // Ben Phone #: ###-####
|
BLD18-01710
| BLD-Footing | 6/26/2018 | 6/27/2018 | 6/27/2018 2:32:42 PM | P | NR |
|
|
Dane Phone #: ###-####
|
BLD18-02035
| BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 2:24:03 PM | P | PASS |
|
|
Doug Phone #: ###-####
|
BLD18-00313
| BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 2:15:43 PM | P | PASS |
|
|
TJ Phone #: ###-####
|
BLD18-00723
| BLD-Final | 6/26/2018 | 6/27/2018 | 6/27/2018 2:15:31 PM | P | PASS |
|
|
TJ Phone #: ###-####
|
BLD18-00723
| DOC - Permit Finaled | 6/27/2018 | 6/27/2018 | 6/27/2018 2:15:23 PM | P | PASS |
|
|
|
BLD17-02291
| BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 12:53:07 PM | P | NR |
|
|
call when on way // Dusty Phone #: ###-#### needs air seal mec rough in and truss enginering
|
BLD18-00684
| BLD-Other | 6/27/2018 | 6/27/2018 | 6/27/2018 12:52:29 PM | P | PART |
|
|
floor joist & insulation - Al Phone #: ###-#### part west half floor ok to cover
|
BLD17-00022
| BLD-Final | 6/26/2018 | 6/27/2018 | 6/27/2018 12:09:48 PM | A | NR |
|
|
Tyler Phone #: ###-#### needs other trades to final or go to tco also walked site they have several ada items that will need to be fixed also signage in stair towers
|
BLD18-01777
| BLD-Final | 6/26/2018 | 6/27/2018 | 6/27/2018 12:07:47 PM | A | PASS |
|
|
Inspection can be done at anytime. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD18-01777
| DOC - Permit Finaled | 6/27/2018 | 6/27/2018 | 6/27/2018 12:07:38 PM | P | PASS |
|
|
|
BLD16-02008
| BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 11:05:25 AM | P | CANC |
|
|
Area B cover inspection at 4th floor. Call Adam when heading to the site. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Inspection cancelled from web by: Adam Johnson
|
BLD18-00744
| BLD-Footing | 6/26/2018 | 6/27/2018 | 6/27/2018 10:40:41 AM | A | PASS |
|
|
Jeff Phone #: ###-####
|
BLD17-01390
| BLD-Final | 6/26/2018 | 6/27/2018 | 6/27/2018 9:23:46 AM | A | NR |
|
|
Doug Phone #: ###-#### needs zoning final on drh
|
BLD16-02008
| BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 9:22:22 AM | A | PART |
|
|
Framing Inspection, level 4. Call Adam when heading to site. Thanks, AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson see sign off sheet ok to insulate
|
BLD16-03163
| BLD-Conference | 6/27/2018 | 6/27/2018 | 6/27/2018 12:00:00 AM | P | CANC |
|
|
Kelly Phone #: ###-####
|