BLD17-02160
| BLD-Framing/Rough-in | 8/1/2017 | 8/1/2017 | 8/1/2017 4:21:37 PM | P | PART |
|
|
Lucinda Phone #: ###-#### ok to cover upstairs
|
BLD17-01369
| BLD-Framing/Rough-in | 8/1/2017 | 8/1/2017 | 8/1/2017 4:21:01 PM | P | PEND |
|
|
Shane Phone #: ###-#### ok to insulate after elec rough in is signed off
|
BLD17-01818
| BLD-Wall Bracing | 8/1/2017 | 8/1/2017 | 8/1/2017 2:10:54 PM | P | PASS |
|
|
Shear // Mike Phone #: ###-####
|
BLD17-02112
| BLD-Framing/Rough-in | 8/1/2017 | 8/1/2017 | 8/1/2017 1:49:40 PM | P | PART |
|
|
Mike Phone #: ###-#### shear ok
|
BLD16-00973
| DOC - Permit Finaled | 8/1/2017 | 8/1/2017 | 8/1/2017 11:39:42 AM | P | PASS |
|
|
|
BLD17-00090
| BLD-Concrete | 8/1/2017 | 8/1/2017 | 8/1/2017 11:27:27 AM | A | DONE |
|
|
Rebar inspection of structural mat slab. Grids 5 to 11 from A to E. Phone #: ###-#### Inspection requested via web by Dan Koski
|
BLD17-02034
| BLD-Footing | 7/31/2017 | 8/1/2017 | 8/1/2017 11:25:03 AM | A | PASS |
|
|
Inspection requested via web by Jeff Ware
|
BLD16-00973
| BLD-Final | 8/1/2017 | 8/1/2017 | 8/1/2017 8:33:38 AM | A | PASS |
|
|
Mandy Phone #: ###-####
|
BLD16-03614
| BLD-Final | 7/31/2017 | 8/1/2017 | 8/1/2017 8:28:25 AM | A | PASS |
|
|
Please call Jody Wise ###-#### for access to pool area 20 minutes before you arrive to inspect. Thanks Phone #: ###-#### Inspection requested via web by Jody Wise
|
BLD16-04491
| DOC - Permit Finaled | 8/1/2017 | 8/1/2017 | 8/1/2017 6:16:45 AM | A | PASS |
|
|
|