Inspections for the day of: Thursday, September 19, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00644 BLD-Wall Bracing9/19/20199/19/20199/20/2019 7:00:11 AMPNR
Marc Phone #: ###-#### needs 9 hold downds restaple and nial front wall
BLD19-03290 BLD-Framing/Rough-in9/18/20199/19/20199/20/2019 6:59:02 AMPPEND
Dave, There is no inspection for structural. Can you please call me in the morning. Thanks, Todd Phone #: ###-#### Inspection requested via web by Ed Gentherok after spec looks at epox for post bases
BLD19-02225 BLD-Framing/Rough-in9/19/20199/19/20199/20/2019 6:57:46 AMPPASS
Dale Phone #: ###-####
BLD19-01465 BLD-Conference9/18/20199/19/20199/19/2019 3:07:18 PMAPASS
Conference with Hannah on Framing Phone #: ###-#### Inspection requested via web by Jake Wilson framing ok
BLD19-03053 BLD-Footing9/19/20199/19/20199/19/2019 3:06:20 PMPPASS
Ryan Phone #: ###-####
BLD19-00278 BLD-Wall cover9/19/20199/19/20199/19/2019 1:48:04 PMPPASS
Second floor elevator shaft drywall and fire tape. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD18-03423 BLD-Conference9/18/20199/19/20199/19/2019 11:51:35 AMADONE
Eric Phone #: ###-####
BLD19-01927 BLD-Conference9/18/20199/19/20199/19/2019 8:42:55 AMADONE
Inspector requirements for Tenant build-out Phone #: ###-#### Inspection requested via web by Sam Reading