Inspections for the day of: Friday, January 10, 2020.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00221 INSP-Sprinkler Rough-in1/9/20201/10/20201/10/2020 12:00:00 AMAPASS
**PASS* 1st floor common areas ok to cover. 1st floor units finaled for visual only.***MAS**
tom Phone #: ###-####
FIR19-00863 INSP-Final Inspection1/9/20201/10/20201/10/2020 12:00:00 AMACANC
*Revised plans are to be dropped off at City Hall for Troy.**MAS**
Dropping off the new drawing! Thank you Troy cobbley! Phone #: ###-#### >> Inspection requested via web by Don Kartchner
FIR19-00775 INSP-Sprinkler Rough-in1/9/20201/10/20201/10/2020 12:00:00 AMPPASS
*PASS** Ok to cover underground. Thrust blocks in place, rebar tie downs coated.**MAS**
underground // Kyle Phone #: ###-####
FIR19-00832 INSP-Final Inspection1/8/20201/10/20201/10/2020 12:00:00 AMPPASS
*PASS One escutcheon needed to be replaced due to being painted which Gabe replaced. Signs mounted, and irrigation tied into the flowswitch. Alarm timed out at 43sec. MAS**
Gabe Garduno is the contact for this Final Inspection. Thank you for your help Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR19-00718 INSP-Final Inspection1/9/20201/10/20201/10/2020 12:00:00 AMPFAIL
**Failed* Ceilings need patching around escutcheons, irrigation needs to tied into flow switch, required signage needs to mounted on riser.**MAS**
Call James before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello