FIR19-00221
| INSP-Sprinkler Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 12:00:00 AM | A | PASS |
|
|
**PASS* 1st floor common areas ok to cover. 1st floor units finaled for visual only.***MAS**
tom Phone #: ###-####
|
FIR19-00863
| INSP-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 12:00:00 AM | A | CANC |
|
|
*Revised plans are to be dropped off at City Hall for Troy.**MAS**
Dropping off the new drawing! Thank you Troy cobbley! Phone #: ###-#### >> Inspection requested via web by Don Kartchner
|
FIR19-00775
| INSP-Sprinkler Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 12:00:00 AM | P | PASS |
|
|
*PASS** Ok to cover underground. Thrust blocks in place, rebar tie downs coated.**MAS**
underground // Kyle Phone #: ###-####
|
FIR19-00832
| INSP-Final Inspection | 1/8/2020 | 1/10/2020 | 1/10/2020 12:00:00 AM | P | PASS |
|
|
*PASS One escutcheon needed to be replaced due to being painted which Gabe replaced. Signs mounted, and irrigation tied into the flowswitch. Alarm timed out at 43sec. MAS**
Gabe Garduno is the contact for this Final Inspection. Thank you for your help Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR19-00718
| INSP-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 12:00:00 AM | P | FAIL |
|
|
**Failed* Ceilings need patching around escutcheons, irrigation needs to tied into flow switch, required signage needs to mounted on riser.**MAS**
Call James before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
|