Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00718 INSP-Final Inspection1/15/20201/15/20201/15/2020 3:17:14 PMPPASS
Permit finaled.

James will reach out on panel patching. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00863 INSP-Final Inspection1/14/20201/15/20201/15/2020 3:16:26 PMAPASS
permit finaled

Just need the approval stamp after the puff test last week! Thanks Troy! Phone #: ###-#### Inspection requested via web by Don Kartchner
FIR19-00221 INSP-Sprinkler Rough-in/Hydro1/14/20201/15/20201/15/2020 1:45:40 PMAPASS
The remaining overhead hydro tests have been witnessed. This included the basement, stand pipe feed and the feed to the dry pipe system.

tOM Phone #: ###-####
BLD19-01141 FIRE-Final Inspection1/13/20201/15/20201/15/2020 1:29:50 PMAPASS
Life safety passed. Alex Phone #: ###-####
BLD19-04186 FIRE-Final Inspection1/14/20201/15/20201/15/2020 1:09:56 PMAFAIL
Provide emergency lighting as discussed and repair the exit sign. Provide occupant load sign and provide sticker at the keyed main exit door.

Suman Phone #: ###-####
BLD19-04991 FIRE-Final Inspection1/14/20201/15/20201/15/2020 10:36:29 AMAPASS
Life safety passed. The buidling inspector will verify the exit discharge lights have been repaired. memo Phone #: ###-####
BLD19-04938 FIRE-Final Inspection1/14/20201/15/20201/15/2020 10:30:10 AMAPASS
Life safety passed.

rOBERT Phone #: ###-####
BLD19-02615 FIRE-Final Inspection1/14/20201/15/20201/15/2020 9:34:20 AMAPASS
Life safety passed. Contractor to remove thumbturn dead bolt from main exit, keyed ok prior to the building inspection.

Tony Phone #: ###-####