FIR12-00741
| INSP-Sprinkler Rough-in/Hydro | 1/17/2013 | 1/17/2013 | 1/17/2013 4:15:50 PM | P | PASS |
|
|
Overhead hydro and rough-in passed.
|
FIR12-00557
| INSP-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 3:59:58 PM | P | PASS |
|
|
Permit finaled
|
BLD12-00334
| FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 3:11:05 PM | P | FAIL |
|
|
The project related fire alarm permit needs addressed and then life safety can be finaled.
|
BLD12-00342
| FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 3:09:50 PM | P | FAIL |
|
|
The project related fire alarm permit needs addressed, correct fire extinguishers as discussed and the NFPA signs posted.
|
BLD12-00344
| FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 2:50:47 PM | P | PASS |
|
|
Life safety passed
|
BLD12-00220
| FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 2:37:23 PM | P | PASS |
|
|
life safety passed
|
BLD12-00081
| FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 2:28:18 PM | P | PASS |
|
|
Life safety passed
|
FIR09-00510
| INSP-Conference | 1/17/2013 | 1/17/2013 | 1/17/2013 2:09:14 PM | P | DONE |
|
|
Went over details to final this project with Matt Casey. and with the onsite store manager Alan. It appears plan modifications will be required.
|
BLD12-02304
| FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 1:56:23 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00744
| INSP-Final Inspection | 1/16/2013 | 1/17/2013 | 1/17/2013 1:45:27 PM | P | FAIL |
|
|
The audible notification devices are not synchronized as required per NFPA 72 18.4.2.5 . The tenant area new devices do not sync with the existing area corridor devices.
|
FIR12-00741
| INSP-Sprinkler Rough-in/Hydro | 1/17/2013 | 1/17/2013 | 1/17/2013 11:13:43 AM | P | FAIL |
|
|
Overhead hydro test for the new storage area piping failed due to visable drop on the pressure guage. Also the earthquake attachments do not match the city approved drawings and don't have through bolts for the wood members per NFPA 13 Chapter 9.
|