BLD18-00803
| FIRE-Final Inspection | 1/17/2019 | 1/18/2019 | 1/18/2019 12:31:53 PM | P | PART |
|
|
life safety for Servery Area, Phase 3 is passed. Kevin is going to finish mounting the two fire extinguishers. Exit signs and emergency lights tested.
Call Kevin when you arrive. Phone #: ###-#### Inspection requested via web by Kevin Antonucci
|
NAF18-00124
| INSP-Sprinkler Rough-in | 1/17/2019 | 1/18/2019 | 1/18/2019 12:03:52 PM | A | PASS |
|
|
First floor community room sprinkler piping is ok for cover, first floor 4" main resident earthquake bracing in the Residential corridor is passed, the east end second floor Resident rooms as marked on the plans are ok for cover except for the area where the patio sprinkler will be required to be connected. One pendnat needs to be added in a furnace room
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
NAF18-00140
| INSP-Sprinkler Rough-in/Hydro | 1/17/2019 | 1/18/2019 | 1/18/2019 11:53:52 AM | A | PASS |
|
|
Underground hydro test witnessed
|
BLD18-03211
| FIRE-Final Inspection | 1/16/2019 | 1/18/2019 | 1/18/2019 10:57:19 AM | A | PASS |
|
|
life safety passed
Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
|
BLD18-04086
| FIRE-Final Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 8:18:08 AM | A | CANC |
|
|
Cancel per Jon.
jon craft Phone #: ###-#### Inspection requested via web by Jonathan Craft
|
FIR19-00003
| INSP-Final Inspection | 1/16/2019 | 1/18/2019 | 1/18/2019 8:17:48 AM | A | CANC |
|
|
Cancel per General Contractor. Phone #: ###-#### Inspection requested via web by Ken Webster
|