Inspections for the day of: Tuesday, January 21, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00237 INSP-Alarm Testing1/15/20201/21/20201/21/2020 4:01:38 PMAFAIL
Will be ok to final when test papers are received.

Call Jake Adams. District and Alarm Co personnel will be on site. Phone #: ###-#### Inspection requested via web by Jeff Gooch
FIR18-00330 INSP-Final Inspection1/15/20201/21/20201/21/2020 4:01:03 PMAFAIL
Will be ok to final when test papers are receicved.

Call Jake Adams. District and Alarm Co personnel will be on site Phone #: ###-#### Inspection requested via web by Jeff Gooch
FIR19-00816 INSP-Sprinkler Rough-in1/21/20201/21/20201/21/2020 3:57:06 PMPCANC
Cancel per James.

Call James before heading out, for Tower 1 only. (4 towers on this building) Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD06-02322 FIRE-Final Inspection1/17/20201/21/20201/21/2020 2:30:21 PMAFAIL
For a temp on life safety for Building A the project related fire alram permit needs the addressing corrected as discussed and as-built eventually submitted. All sprinkler work and life safety items as addressed in the review comments have been done. As per plan review the requirements for stand pipes has been deleted. Lee Scott Phone #: ###-####
BLD19-03234 FIRE-Final Inspection1/21/20201/21/20201/21/2020 2:18:14 PMPCANC
The project related fire alarm permit is not ready. This permit will need to be rescheduled. Troy,

Hopefully the alarm is correct this time. The code to get in the building is 1566

Thanks,

Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
FIR19-00822 INSP-Sprinkler Rough-in1/21/20201/21/20201/21/2020 1:36:46 PMPPASS
Phase 2 sprinkler rough-in passed. Piping can be covered. See plans for two pendants circled in red that have not been installed yet.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00909 INSP-Final Inspection1/21/20201/21/20201/21/2020 12:40:35 PMPCANC
Owner would not let us test fire alarm. Will need to be rescheduled.

Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR19-00754 INSP-Sprinkler Rough-in/Hydro1/17/20201/21/20201/21/2020 11:41:24 AMAFAIL
Overhead hydo test failed based on visible loss of pressure at guage. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00884 INSP-Final Inspection1/17/20201/21/20201/21/2020 11:34:41 AMAPASS
Permit finaled.

Phone #: ###-#### Inspection requested via web by Rick Groom
FIR19-00468 INSP-Sprinkler Rough-in/Hydro1/20/20201/21/20201/21/2020 11:19:23 AMAPASS
First floor rough in passed.


RUDY IS OUR CONTACT.
THIS IS A ROUGH-IN FOR THE 1ST FLOOR ONLY AT THIS TIME Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR19-00221 INSP-Final Inspection1/20/20201/21/20201/21/2020 10:51:34 AMAPASS
Permit finaled.


Please contact Tom Smalls for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR19-00949 INSP-Sprinkler Rough-in1/21/20201/21/20201/21/2020 12:00:00 AMPPART
**OK to cover hardlids only. NOT OK to plug head in wheelchair closet.. Branch line restraints need to be checked during full rough inspection. MAS**
Mike Phone #: ###-####