FIR19-00230
| INSP-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 3:55:17 PM | P | CANC |
|
|
Cancel per discussion with Josiah due to issues with the fire alarm panel.
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
FIR19-00365
| INSP-Supply line flush | 1/29/2020 | 1/29/2020 | 1/29/2020 3:54:38 PM | P | PASS |
|
|
Underground supply line flush witnessed.
|
FIR19-00365
| INSP-Sprinkler Rough-in/Hydro | 1/28/2020 | 1/29/2020 | 1/29/2020 2:07:05 PM | P | CANC |
|
|
Not ready for hydro due to Suez needing an extended flush time because of water discoloration.
Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00816
| INSP-Sprinkler Rough-in | 1/29/2020 | 1/29/2020 | 1/29/2020 1:59:31 PM | P | FAIL |
|
|
need plan mods/as-builts showing the pipe routing changes, need the tenting repaired. No piping can be covered yet.
Ready any time, call James before heading out. Overhead rough and tenting. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD18-04294
| FIRE-Final Inspection | 1/27/2020 | 1/29/2020 | 1/29/2020 1:56:59 PM | P | FAIL |
|
|
See the Fire life safety review comments for items marked in red that need addressed. It includes testing of the three emergency off switches, duct smoke detectors, adding exit discharge lighting at the Store Room exit, removing the dead bolt at the Beer Cooler, removing the thumb turn dead bolts at both main exit doors, providing an operational permit for the tank storage/exchange, 6" island's....ect.
Phone #: ###-#### Inspection requested via web by Roger Graves
|
FIR19-00599
| INSP-Supply line flush | 1/28/2020 | 1/29/2020 | 1/29/2020 12:37:40 PM | A | PASS |
|
|
Underground supply line flush passed but this is the wrong permit number. Actual permit is FIR19-00365 and an entry has been made there.
Kenny Caldwell will be the contact. Stacey with the water will be there between 10 and 10:30 AM. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00599
| INSP-Sprinkler Rough-in | 1/27/2020 | 1/29/2020 | 1/29/2020 12:35:14 PM | A | PASS |
|
|
Overhead rough-in, branchlines/hangers, for the Kitchen area passed. An additional cover inspection will be needed when T-bar has been installed. Kenny Caldwell is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-04367
| FIRE-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:27:26 PM | P | FAIL |
|
|
Mount the fire extinguisher as discussed and provide the correct Suite number. Plans say 100 tenant wants 300. Please call 15 min. prior to arrival so I can ensure I''m there. Inspection requested via web by Justin Schwartz
|
BLD19-04769
| FIRE-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:13:31 PM | P | PASS |
|
|
Life safety passed.
Ben Covert Phone #: ###-####
|
BLD19-04869
| FIRE-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:12:45 PM | P | PASS |
|
|
Life safety passed
|
FIR20-00044
| INSP-Final Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 12:05:10 PM | P | PASS |
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR20-00044
| INSP-Sprinkler Rough-in | 1/29/2020 | 1/29/2020 | 1/29/2020 12:04:48 PM | P | PASS |
|
|
Rough-in passed. Phone #: ###-#### Inspection requested via web by Sam Ball
|
BLD18-03877
| FIRE-Final Inspection | 1/28/2020 | 1/29/2020 | 1/29/2020 9:56:04 AM | P | PASS |
|
|
Life safety passed for Bldg #1/Club House.
Final inspection is also scheduled for today. We should be ready anytime. Phone #: ###-#### Inspection requested via web by chad stradley
|
FIR20-00028
| INSP-Sprinkler Rough-in | 1/27/2020 | 1/29/2020 | 1/29/2020 9:36:17 AM | A | PASS |
|
|
The overhead rough-in passed. Tenting verified. Piping is of for cover. Rough and tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD19-01275
| FIRE-Final Inspection | 1/27/2020 | 1/29/2020 | 1/29/2020 8:24:05 AM | A | PASS |
|
|
Life safety passed. Contractor to remove the non-functional door mags at the main exit as discussed.
Call prior to arrival, needing to conduct with Fire Final Phone #: ###-#### Inspection requested via web by Roy Moore
|
FIR19-00679
| INSP-Final Inspection | 1/28/2020 | 1/29/2020 | 1/29/2020 8:22:11 AM | A | PASS |
|
|
Permit finaled.
Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00353
| INSP-Sprinkler Rough-in | 1/29/2020 | 1/29/2020 | 1/29/2020 12:00:00 AM | P | PART |
|
|
EQ bracing on 1st floor corridor pass. Piping on 1st floor corridir pass. Fire penetration need to be finished, also patching of sheetrock around EQ bracing needs to be completed and inspected before ok to cover.**MAS**
as late as possible Phone #: ###-#### >> Inspection requested via web by jeremiah robison
|
FIR20-00050
| INSP-Sprinkler Rough-in | 1/29/2020 | 1/29/2020 | 1/29/2020 12:00:00 AM | P | DONE |
|
|
PASS rough ok to cover**MAS
Phone #: ###-#### >> Inspection requested via web by Sam Ball
|