FIR19-00374
| INSP-Sprinkler Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 2:40:42 PM | P | PART |
|
|
The sprinkler work is complete in apartments 105, 106, 205, 206, 305 and 306.
|
BLD18-03122
| FIRE-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 1:36:49 PM | A | PART |
|
|
Life safety passed for apartments 105, 106, 205, 206, 305 and 306.
matt Phone #: ###-####
|
BLD18-03486
| FIRE-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 1:29:51 PM | A | PASS |
|
|
Life safety passed. Phone #: ###-####
|
NAF18-00086
| INSP-Supply line flush | 10/15/2019 | 10/15/2019 | 10/15/2019 11:07:07 AM | P | FAIL |
|
|
Called contact and left message. Called office and spoke to person to pass on message I was on the way. Arrived and job site with the fire alarm contractor but he was unable to operate flow switch. I also noted missing sprinkler canopy on second floor. I did not continue to third floor tamper switches have not been installed on valves. Will need to check plan mods for clarification. Contact Ken Orahood ###-#### 30 min prior to Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF19-00048
| INSP-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 11:04:23 AM | A | FAIL |
|
|
The fire sprinkler contractor was not present to provide testing of the flow switch. Need follow up on tamper switch requirement. Need record of completion when project is finaled. All other devices tested. Call prior to going Phone #: 2088991516 >> Inspection requested via mobile web by John Lopez
|
BLD19-01233
| FIRE-Final Inspection | 10/11/2019 | 10/15/2019 | 10/15/2019 10:50:01 AM | A | PART |
|
|
A temp for life safety is being given until the as-builts/plan mods are approved.
Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
FIR19-00585
| INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 10:48:41 AM | A | PART |
|
|
A temporary for fire alarm is being given. Provide as-builts/plan mods showing the strobe candella changes in the Cafeteria and all of the exisiting initiating devices in the scope of work. When plan review approvs the changes permit can be finaled.
Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
BLD19-01233
| FIRE-Alarm Testing | 10/11/2019 | 10/15/2019 | 10/15/2019 10:26:38 AM | A | DONE |
|
|
See the project related fire alarm permit for specifics for the fire alarm testing.
|
NAF18-00086
| INSP-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 6:53:30 AM | P | CANC |
|
|
Contact ken Orahood ###-#### 30 Min Prior to Final Insp Start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
FIR17-00626
| INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 6:52:25 AM | A | PART |
|
|
Phase 4 fire alarm complete. See the city approved plans for the area clouded in red that was inspected for phase 4. Brian Phone #: ###-####
|
FIR19-00353
| INSP-Sprinkler Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 12:00:00 AM | P | PART |
|
|
**2nd, 3rd floors, and stairwells OK to cover. Sidewalls changed to Viking EC's in guest rooms over 18'-0"*MAS***
Nick is the contact thank you Phone #: ###-#### >> Inspection requested via web by jeremiah robison
|
FIR18-00867
| INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/14/2019 4:00:38 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
FIR18-00778
| INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/14/2019 4:00:21 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
NAF18-00086
| INSP-Final | 10/14/2019 | 10/15/2019 | 10/14/2019 2:19:30 PM | P | CANC |
|
|
Contact Andrew Larson ###-#### 30 min prior to Final Insp Start please.
Thank YOU, Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|