Inspections for the day of: Thursday, October 18, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00800 FIRE-Final Inspection10/17/201810/18/201810/19/2018 10:19:49 AMPPASS
Life safety passed. Station 14 approved the opticon


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00799 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:20:42 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00798 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:20:13 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00797 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:19:52 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00795 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:19:19 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00919 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:18:55 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00920 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:18:31 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00921 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:18:07 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.


Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD18-00685 FIRE-Final Inspection10/17/201810/18/201810/18/2018 2:17:37 PMPPASS
Life safety passed. The Opticon was tested by Station 14. Plan review is ok with the 4'-9" access to man gates.

Phone #: ###-#### Inspection requested via web by KJ Savaria
FIR18-00414 INSP-Final Inspection10/16/201810/18/201810/18/2018 1:37:50 PMPCANC
Not ready for final

Jordan Fuger is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00130 INSP-Final Inspection10/16/201810/18/201810/18/2018 1:37:22 PMPPASS
Permit finaled

Jordan Fuger is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00414 INSP-Sprinkler Rough-in10/17/201810/18/201810/18/2018 1:36:27 PMAPASS
Forward flush test passed, Second floor rough-in passed and piping can be re-covered. Need ball drip piped, need pressure relief vavles piped, need interconnection with the fire alarm system tested, need soffits for the ESFR heads finished installed, need the overhead door stops installed as discussed.

Jordan Fuger is the contact for this rough to cover inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-01332 FIRE-Conference10/18/201810/18/201810/18/2018 1:34:14 PMPDONE
I went over life safety requirements

Steve Phone #: ###-####
BLD18-01555 FIRE-Final Inspection10/17/201810/18/201810/18/2018 10:43:52 AMAPASS
Life safety passed

after 9am // Jake Erickson Phone #: 208-###-####
FIR17-00626 INSP-Final Inspection10/17/201810/18/201810/18/2018 9:29:07 AMAFAIL
Need to pretest interconnection with the fire sprinkler devices, one 15cd strobe is mounted too high, another 15cd strobe is overspaced, missing two weather proof back boxes, drawings show networking with the airport fire alarm system but networking has not been set up so there is no off site or on site communiction. No actual testing performed.


Please call to schedule exact time. Phone #: ###-#### Inspection requested via web by Gary Gambino
FIR17-00603 INSP-Final Inspection10/17/201810/18/201810/18/2018 9:26:44 AMAFAIL
The interconnection with the fire alarm panel has not been pre-tested, the FDC is not in the location shown as approved on the plans, need to perform a forward flush test now since people will be utilizing the new area that the new fire sprinkler system protects.


Todd Ketterling is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR17-00507 INSP-Final Inspection10/17/201810/18/201810/18/2018 9:24:53 AMAPASS
Permit finaled

Todd Ketterling is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD17-04316 FIRE-Final Inspection10/17/201810/18/201810/18/2018 8:15:24 AMAPART
Life safety complete for the second floor. All emergency lights and exit signs have been repaired. Can't final the permit until the sprinkler permit is complete which is providing sprinkler protection at the ground level, at the stairs.

Phone #: ###-#### Inspection requested via web by Bob Thornton