Inspections for the day of: Friday, October 18, 2019.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00106 INSP-Final Inspection10/17/201910/18/201910/21/2019 9:56:46 AMAPART
A life safety temp for the use of the two elevators is being given with boise fire permission with the states acceptance. The acceptance paperwork is attached to this permit. Per dicussion with Jim Shilton these elvators will still need to be re-inspected by the fire code inspector prior to a final sign off as discussed.

Phone #: ###-#### Inspection requested via web by Jim Shilton
FIR19-00207 INSP-Final Inspection10/18/201910/18/201910/18/2019 3:40:53 PMPPASS
Permit finaled. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00634 INSP-Final Inspection10/17/201910/18/201910/18/2019 3:26:33 PMPCANC
I'm unable to perform the inspection when the contractor was ready. The site requested that the inspection start at 2:00 pm if possible since they have several meetings during the day. Please call Nate at ###-####
with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
FIR17-00400 INSP-Final Inspection10/17/201910/18/201910/18/2019 3:25:40 PMPPASS
Permit finaled

Jake Adams (BSD) will be on site with copy of plans. We finally have a clean FACP! Please call Jake 30 minutes prior to Inspector arrival. Phone #: ###-#### Inspection requested via web by Jeff Gooch
BLD19-03790 FIRE-Final Inspection10/17/201910/18/201910/18/2019 3:23:45 PMPCANC
Need the project related fire sprinkler permit finaled prior to a fire life safety inspection. Terry Phone #: ###-####
BLD18-03122 FIRE-Final Inspection10/18/201910/18/201910/18/2019 2:31:22 PMPPART
Life safety on units 101 202 203 302 303 103 104 203 204 303 304 is complete. 102 had a smoke alarm too close to the restroom door. // Matt ###-####
FIR19-00595 INSP-Sprinkler Rough-in10/18/201910/18/201910/18/2019 2:26:32 PMPPASS
Rough-in passed. Piping can be covered. Phone #: ###-#### Inspection requested via web by Sam Ball
BLD19-02934 FIRE-Conference10/18/201910/18/201910/18/2019 1:29:34 PMPDONE
The project superintendant and I discussed door hardware issues on doors #2 and #3. #2 shows to be deleted and #3 says to have panic. Right now they are both keyed deadbolts.
FIR19-00111 INSP-Final Inspection10/14/201910/18/201910/18/2019 1:15:47 PMACANC
Cancel per Noemi due to the project related fire alarm not being ready. Contact Noemi Carrero ###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00404 INSP-Final Inspection10/17/201910/18/201910/18/2019 12:30:55 PMACANC
Cancel per Jon Beazer since he can not be there when I can be there. . We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-00317 FIRE-Final Inspection10/17/201910/18/201910/18/2019 12:13:18 PMAFAIL
Need fire review notes and all small documents, the site and building address/number need to match the permit documents, provide lever hardware as per the approved door schedule, provide clearance at the fire hydrants..Inspection stopped.

Larry Phone #: ###-####
BLD19-03132 FIRE-Final Inspection10/17/201910/18/201910/18/2019 11:48:54 AMAPASS
Life safety passed. Ok for life safety permanant. Jonathan Phone #: ###-####
FIR19-00374 INSP-Final Inspection10/18/201910/18/201910/18/2019 11:32:53 AMAPART
Fire sprinkler work complete in 105, 106, 205, 206, 305 and 306
BLD18-04112 FIRE-Final Inspection10/17/201910/18/201910/18/2019 10:37:46 AMAPART
A temporary for life safety is ok with the fire dept approval until the existing fire dept access as been modified as discussed to cut back the trees and provide a ramp. jay Phone #: ###-####
BLD18-02497 FIRE-Final Inspection10/17/201910/18/201910/18/2019 10:10:09 AMAFAIL
Provide information for the change to a diesel gererator, provide testing of the automatic switch over of the generator since it did not function, provide signage for the gererator as discussed, provide testing of the exit signs and emergency lights, provide fire lane signage. See the review comments for items marked in blue.

Ken Phone #: ###-####
FIR19-00668 INSP-Sprinkler Rough-in10/17/201910/18/201910/18/2019 10:01:51 AMAPASS
Rrough-in passed. Piping can be covered.

Phone #: ###-#### Inspection requested via web by Sam Ball
NAF19-00003 INSP-Final10/17/201910/18/201910/18/2019 9:46:38 AMADONE
Life safety passed.

Call prior to going Phone #: 2086972714 >> Inspection requested via mobile web by BRAD COOPER
NAF19-00104 INSP-Final10/17/201910/18/201910/18/2019 9:46:09 AMADONE
Permit finaled

RICK FRY Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR17-00626 INSP-Final Inspection10/17/201910/18/201910/18/2019 9:14:39 AMAPART
Fire alarm work complete for phase 4. See the city approved plans for the clouded area in red for the specific devices witnessed.

Brian Phone #: ###-####
BLD19-02882 FIRE-Final Inspection10/17/201910/18/201910/18/2019 8:46:16 AMAPASS
Life safety passed.

Phone #: ###-####
FIR19-00662 INSP-Sprinkler Rough-in10/17/201910/18/201910/18/2019 8:44:58 AMAPASS
The remaining underground supply piping is ok for cover. Bryan Collins is requesting a Underground Rough in Inspection.

Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-02065 FIRE-Final Inspection10/17/201910/18/201910/18/2019 12:00:00 AMAPASS
**PASS Fire Final. Tenant GC still waiting on core&shell to be finaled. Perm Occ signed.MAS**
josh Phone #: ###-####
FIR18-00892 INSP-Sprinkler Rough-in10/17/201910/18/201910/17/2019 2:20:30 PMACANC
Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes