Inspections for the day of: Tuesday, October 22, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00747 INSP-Sprinkler Rough-in10/22/201910/22/201910/22/2019 3:07:31 PMPPASS
Rough-in approved.

Approved plans are on site. There are no new ceilings being installed, this rough in is to make sure everything looks good before we schedule a final. Please call Matt before heading to the site at Phone #: ###-#### Inspection requested via web by Matt Barnard
BLD18-03122 FIRE-Final Inspection10/22/201910/22/201910/22/2019 2:49:25 PMPPASS
Life safety passed.

Matt Phone #: ###-####
BLD18-02497 FIRE-Final Inspection10/22/201910/22/201910/22/2019 2:00:27 PMPPART
A temp for life safety is being given with boise fire approval. Need a permit for the solar panel/system and one additional exit discharge light is needed at the south east exit door.

Ken Phone #: ###-####
FIR19-00544 INSP-Sprinkler Rough-in10/21/201910/22/201910/22/2019 1:51:57 PMPPASS
Rough-in passed for the remaining piping. Piping can be covered. One pendant head still needs to be added in the small closet.

Contact Noemi Carrero ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00704 INSP-Final Inspection10/22/201910/22/201910/22/2019 1:07:13 PMPPASS
Rough-in passed. Piping ok for cover.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD18-04449 FIRE-Final Inspection10/21/201910/22/201910/22/2019 12:36:58 PMAPASS
Life safety passed,.

Michael Phone #: ###-####
FIR19-00221 INSP-Sprinkler Rough-in10/21/201910/22/201910/22/2019 12:15:45 PMAPASS
See the city approved plans for an additional apartment on the first floor south building where soffit piping is ok for cover. Tom Phone #: ###-####
BLD17-02262 FIRE-Final Inspection10/22/201910/22/201910/22/2019 11:36:14 AMPPASS
Life safety passed.

Tony Phone #: ###-####
BLD17-02261 FIRE-Final Inspection10/22/201910/22/201910/22/2019 11:35:29 AMPPASS
Life safety passed.


Tony Phone #: ###-####
FIR19-00531 INSP-Sprinkler Rough-in/Hydro10/21/201910/22/201910/22/2019 10:39:13 AMAPASS
The underground hydro test was witnessed with no visible pressure loss.

Matt Phone #: ###-####
FIR19-00365 INSP-Sprinkler Rough-in10/21/201910/22/201910/22/2019 10:30:04 AMAPASS
Rough-in for piping and hangers passed for the north wing. See the city approved plans for location. Another rough to cover inspection will be required when the drops have been installed . I noted acouple of missing upright heads and possible blocked heads due to truss webbing. I went over the "three time rule" with fitter.
BLD19-00771 FIRE-Final Inspection10/21/201910/22/201910/22/2019 10:20:44 AMAPART
Temp for life safety until the project related fire alarm permit is finaled. eciso Phone #: ###-####
FIR19-00355 INSP-Final Inspection10/21/201910/22/201910/22/2019 10:20:04 AMAPART
A temp for fire alarm with boise fire approval until a notification device is added in the Reading Room. These are engineered plans and will need their approval prior to submittal to the city.

possibly 7am // Brandon Phone #: ###-####
FIR19-00359 INSP-Final Inspection10/21/201910/22/201910/22/2019 10:00:17 AMAPASS
Permit finaled

Contact Ken Orahood ###-#### 30 Min prior to Final Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank