FIR09-00384
| INSP-Sprinkler Rough-in | 10/28/2009 | 10/29/2009 | 10/29/2009 12:57:32 PM | P | CANC |
|
|
Overbooked. Rescheduled with Jake for tomorrow.
|
FIR09-00510
| INSP-Alarm Testing | 10/28/2009 | 10/29/2009 | 10/29/2009 12:56:49 PM | A | DONE |
|
|
The inspection today included verification of the phone line monitoring, NAC panel interconnection/trouble monitoring, and tamper/flow switch monitoring as marked on the plans. The job site copy of the plans was not on site. We found an anti-freeze system with three unsupervised control valves in the north east corner of the building that needs its annual inspection and the valves electrically monitored. No other items have been tested.
|
BLD09-01833
| FIRE-Final Inspection | 10/29/2009 | 10/29/2009 | 10/29/2009 12:53:18 PM | P | PASS |
|
|
Life safety passed.
|
BLD09-01834
| FIRE-Final Inspection | 10/29/2009 | 10/29/2009 | 10/29/2009 12:52:58 PM | P | PASS |
|
|
Life safety passed.
|
BLD09-00818
| FIRE-Final Inspection | 10/28/2009 | 10/29/2009 | 10/29/2009 11:05:12 AM | P | PASS |
|
|
Life safety passed.
|
BLD09-01881
| FIRE-Final Inspection | 10/28/2009 | 10/29/2009 | 10/29/2009 10:54:30 AM | A | PASS |
|
|
LIfe safety passed.
|
FIR09-00479
| INSP-Sprinkler Rough-in | 10/28/2009 | 10/29/2009 | 10/29/2009 9:50:34 AM | A | PASS |
|
|
The sprinkler piping is ok for cover. Tenting is complete. Several locations needed to be modified while I waited.
|