FIR18-00503
| INSP-Final Inspection | 10/28/2019 | 10/29/2019 | 10/29/2019 3:19:54 PM | P | FAIL |
|
|
Changes verified. Plan mods are needed showing the missing detector at first floor elevator lobby and the three NAC panels that are paired with the three other NAC panels. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
NAF19-00080
| INSP-Final | 10/29/2019 | 10/29/2019 | 10/29/2019 3:18:22 PM | P | DONE |
|
|
Permit finaled
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00713
| INSP-Final Inspection | 10/25/2019 | 10/29/2019 | 10/29/2019 1:56:37 PM | P | CANC |
|
|
Cancel per Burl Phone #: ###-####
|
BLD19-02876
| FIRE-Final Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 10:40:19 AM | P | PASS |
|
|
Life safety passed
please enter through back warehouse door. plans are inside. Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
FIR19-00595
| INSP-Final Inspection | 10/28/2019 | 10/29/2019 | 10/29/2019 10:38:58 AM | P | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00683
| INSP-Final Inspection | 10/25/2019 | 10/29/2019 | 10/29/2019 9:50:54 AM | A | FAIL |
|
|
The owner did not show up to provide access.
The site would like the inspection for 9:30 am or 10:00 am if possible. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
NAF19-00080
| INSP-Final | 10/28/2019 | 10/29/2019 | 10/29/2019 9:38:53 AM | A | FAIL |
|
|
Notification tested ok but the manual pull stations are mounted too high.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00696
| INSP-Sprinkler Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 8:54:48 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR19-00353
| INSP-Sprinkler Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 8:52:52 AM | A | PART |
|
|
Todays inspection was a rough-in for the fourth floor. Rough-in passed for the rooms but piping can not be covered until a tenting inspection has passed. The corridor piping still needs bracing installed. Heads at elevator and shaft need installed.
Please give 30min heads up. Contact Eric Robinson Phone #: ###-#### Inspection requested via web by jeremiah robison
|