Inspections for the day of: Thursday, October 3, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04112 FIRE-Final Inspection10/2/201910/3/201910/3/2019 2:50:44 PMPFAIL
The fire dept access needs addressed as discussed, need K class fire extinguisher, need thumbturn deadbolt on Kitchen door addressed, need the project related fire alarm and hood suppression permits finaled. Jay Phone #: ###-####
FIR19-00732 INSP-Final Inspection10/3/201910/3/201910/3/2019 2:28:47 PMPCANC
The project related fire alarm sysem/permit was not ready.

Attempting to test the alarm system as well. Wondering if 330 would work so all the children are out of the school. Phone #: ###-#### Inspection requested via web by Don Kartchner
FIR19-00445 INSP-Final Inspection10/2/201910/3/201910/3/2019 2:22:55 PMPFAIL
Ceiling mounted strobes are overspaced in the Kitchen. Inspection stopped. Devices need to be relocated or candellas adjusted. The fire alam plans need to be reviewed by the engineer of record prior to plan review approval. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
BLD19-02966 FIRE-Final Inspection10/2/201910/3/201910/3/2019 1:36:22 PMAFAIL
Provide exit discharge lights at both exits per approved plans and provide emergency lighting just inside of the main exit as per plans. Neil Phone #: ###-####
BLD19-03138 FIRE-Final Inspection10/3/201910/3/201910/3/2019 1:28:40 PMPPASS
Life safety passed. Sid Phone #: ###-####
FIR19-00740 INSP-Final Inspection10/2/201910/3/201910/3/2019 1:28:19 PMAPASS
Permit finaled

Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
BLD19-03087 FIRE-Final Inspection10/3/201910/3/201910/3/2019 11:24:34 AMPPASS
Life safety passed. Per plan review the single door out of the exterior of the warehouse, as shown on the plans, is not required. josh Phone #: ###-####
FIR19-00598 INSP-Sprinkler Rough-in10/2/201910/3/201910/3/2019 10:48:57 AMAPASS
Rough-in passed. Piping can be covered. Adam Phone #: ###-####
FIR19-00599 INSP-Sprinkler Rough-in10/2/201910/3/201910/3/2019 10:39:20 AMPPASS
Corrections have been made at the two restrooms. Also see the city approved plans for an additional area where the rough-in has passed dated today. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
NAF19-00052 INSP-Final10/2/201910/3/201910/3/2019 9:39:43 AMADONE
Life safety passed. No equipment or storage racks have been installed. Fans have not been installed and are state for future. Call prior to going Phone #: 2086972714 >> Inspection requested via mobile web by BRAD Looper
NAF19-00081 INSP-Final10/1/201910/3/201910/3/2019 9:37:45 AMADONE
Permit finaled. RUDY CATIC Phone #: ###-#### Inspection requested via web by Brodie Stenquist
NAF19-00081 INSP-Sprinkler Rough-in10/3/201910/3/201910/3/2019 9:37:11 AMPPASS
Rough-in passed. Remaining piping can be covered. Call Jeff if there are questions. Thanks Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR19-00716 INSP-Sprinkler Rough-in10/2/201910/3/201910/3/2019 8:42:30 AMAPASS
Rough-in passed. Piping can be covered. Payton Phone #: ###-####
FIR19-00382 INSP-Final Inspection9/27/201910/3/201910/2/2019 3:53:41 PMACANC
Please call Nate at ###-#### Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt