FIR09-00510
| INSP-Alarm Testing | 10/30/2009 | 10/30/2009 | 10/30/2009 3:12:04 PM | P | PASS |
|
|
The city approved drawings were found. See the city approved drawings, notification sheet, for the list of remaining items/corrections needed.
|
BLD09-01819
| FIRE-Final Inspection | 10/29/2009 | 10/30/2009 | 10/30/2009 2:59:20 PM | A | FAIL |
|
|
Inspection was actually for a conference on sprinkler issues and life safety issues.
|
BLD09-01886
| FIRE-Final Inspection | 10/29/2009 | 10/30/2009 | 10/30/2009 11:57:16 AM | A | PASS |
|
|
life safety passed.
|
FIR09-00321
| INSP-Final Inspection | 10/28/2009 | 10/30/2009 | 10/30/2009 11:39:09 AM | A | FAIL |
|
|
Provide dedicated circuit as per the review comments and NFPA 72 and provide a map at the facp as discussed.
|
FIR09-00611
| INSP-Sprinkler Rough-in | 10/29/2009 | 10/30/2009 | 10/30/2009 11:09:05 AM | A | PASS |
|
|
The sprinkler piping for Phase 3 can be covered.
|