FIR13-00453
| INSP-Sprinkler Rough-in/Hydro | 10/4/2013 | 10/4/2013 | 10/4/2013 3:42:28 PM | P | PASS |
|
|
Underground hydro test passed
|
FIR13-00340
| INSP-Sprinkler Rough-in | 10/4/2013 | 10/4/2013 | 10/4/2013 3:30:47 PM | P | PASS |
|
|
Overhead rough-in passed. Piping can be covered. Riser not complete yet. Underground flush passed. FDC is mounted too high and will need to be lowered.
|
BLD13-02063
| FIRE-Final Inspection | 10/4/2013 | 10/4/2013 | 10/4/2013 2:29:39 PM | P | PASS |
|
|
Life safety passed. Tim, Kmart facilities, is going to repair the two inoperative exit signs.
|
FIR13-00187
| INSP-Alarm Testing | 10/2/2013 | 10/4/2013 | 10/4/2013 2:25:23 PM | A | DONE |
|
|
See the small copy of city approved plans for additional devices tested today and the corrections noted.
|