Inspections for the day of: Monday, October 8, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00510 FIR-Aging Inspection10/8/201210/8/201210/10/2012 8:05:55 AM NR
I spoke to Matt and he is going to get me the contact information for Consolidated Fire.
FIR12-00395 INSP-Sprinkler Rough-in10/8/201210/8/201210/8/2012 3:46:28 PMPPASS
Third floor sprinkler piping can be covered. Tenting has been repaired.
FIR12-00078 INSP-Final Inspection9/25/201210/8/201210/8/2012 3:29:16 PMACANC
Rescheduled for tomorrow.
FIR12-00395 INSP-Sprinkler Rough-in/Hydro10/8/201210/8/201210/8/2012 3:24:53 PMPFAIL
Overhead hydro test for all three systems failed.Performed the test twice.
FIR12-00531 INSP-Supply line flush10/8/201210/8/201210/8/2012 3:23:51 PMPPASS
The center section as shown on the approved plans is ok to cover. Also the underground supply line flush passed.
BLD12-00550 FIRE-Final Inspection10/5/201210/8/201210/8/2012 1:58:57 PMAFAIL
Remove the thumbturn dead bolt from the main exit (keyed is ok), replace the broken electrical cover at the sign, sprinkler heads are overspaced and need to be modified (this work requires a separate permit), provide access to the fire sprinkler riser room to verify annual inspection, repair exit signs and emergency lighting.
BLD12-01393 FIRE-Final Inspection10/5/201210/8/201210/8/2012 11:02:12 AMAPASS
Life safety passed. Inspector Jim Sly verified the installation of the insulation in the combustible concealed spaces. See previous inspection entrys.
FIR12-00560 INSP-Sprinkler Rough-in10/5/201210/8/201210/8/2012 9:57:49 AMAPASS
Sprinkler rough-in passed. piping can be covered.
FIR12-00531 INSP-Sprinkler Rough-in10/4/201210/8/201210/8/2012 8:36:17 AMAPASS
See the city approved plans for two of the three shown locations where the underground supply line can be covered. Per contractor mechanical restraints are being used at the fittings. As-builts are required showing the 6" pipe instead of the 8".