Inspections for the day of: Thursday, November 1, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-02704 FIRE-Final Inspection11/1/201811/1/201811/1/2018 2:17:21 PMPCANC
Mark Phone #: ###-####
BLD18-03905 FIRE-Final Inspection11/1/201811/1/201811/1/2018 11:52:44 AMPPASS
Life safety passed. Smoke evac tested.

Jonny Phone #: ###-####
FIR18-00298 INSP-Final Inspection11/1/201811/1/201811/1/2018 11:52:16 AMPCANC
Can't perform final until a rough-in inspection has been performed. As per previous inspection note the ceiling tile needs to be removed so that the piping can be inspected.

Contact Scotty Powada ###-#### 30 min prior to Fire Final Insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00284 INSP-Final Inspection11/1/201811/1/201811/1/2018 11:51:10 AMPPASS
Permit finaled

Contact Scotty Powada ###-#### 30 min prior to Fire final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD17-03833 FIRE-Final Inspection10/31/201811/1/201811/1/2018 11:16:50 AMAFAIL
Not ready for final yet. The project related fire alarm and fire sprinkler permits need addressed and the non-combustible insulation filling the raised platform needs to be completed and inspected.

Clive Phone #: ###-####
BLD18-01332 FIRE-Final Inspection10/31/201811/1/201811/1/2018 11:03:24 AMAPASS
Life safety passed. No brewing equipment present or installed in the future Brewery.

Steve Phone #: ###-####
BLD18-02579 FIRE-Final Inspection10/31/201811/1/201811/1/2018 10:27:09 AMPPASS
Life safety passed. Per Jeff at TVFP the head infront of the unit heat will be changed to a high temp. today.

Please call 45 minutes before arrival. Thank you.
Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero
FIR18-00570 INSP-Final Inspection11/1/201811/1/201811/1/2018 9:36:05 AMPFAIL
The duct smoke detectors keep giving a invalid responce signal and a calibration signal and the remote LED's do not latch upon alarm.

Phone #: ###-#### Inspection requested via web by Ken Webster
FIR18-00590 INSP-Sprinkler Rough-in10/31/201811/1/201811/1/2018 9:34:58 AMAPASS
See the city approved plans for locations where piping above the hardlids is ok. I noted one earthquake brace needs to be re-positioned

Contact Andrew Larson - ###-#### 30 min prior to RTC Insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00710 INSP-Sprinkler Rough-in10/31/201811/1/201811/1/2018 8:25:46 AMAPASS
Rough-in passed for the two restrooms. Piping can be covered


,


Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00672 INSP-Sprinkler Rough-in10/31/201811/1/201811/1/2018 8:19:27 AMAPASS
Rough-in passed. Piping can be covered.

Phone #: ###-#### Inspection requested via web by Stan Beus