Inspections for the day of: Tuesday, November 13, 2018.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00583 INSP-Sprinkler Rough-in11/13/201811/13/201811/13/2018 4:08:53 PMPFAIL
No city approved plans for the areas requested for inspection

Tony Cetani is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00708 INSP-Sprinkler Rough-in11/13/201811/13/201811/13/2018 4:08:24 PMPFAIL
No city approved plans for the areas requested for inspection

Tony Cetani is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00583 INSP-Sprinkler Rough-in/Hydro11/13/201811/13/201811/13/2018 4:07:39 PMPFAIL
Not ready for hydro since all heads have not been cut in.

Tony Cetani is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00708 INSP-Sprinkler Rough-in/Hydro11/13/201811/13/201811/13/2018 4:07:08 PMPFAIL
Not ready for hydro since all heads have not been cut in.

Tony Cetani is the contact. Thanks:) Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-02709 FIRE-Final Inspection11/13/201811/13/201811/13/2018 3:43:31 PMPCANC
This was scheduled for the wrong day. Is rescheduled for tomorrow with the fire alarm inspection.

Inspection requested via web by Brad Cooper
BLD18-02545 FIRE-Final Inspection11/13/201811/13/201811/13/2018 3:02:21 PMPPART
A temporary for life safety is ok with Ron until the fire sprinkler and fire alarm modifications have been performed. Standard time length applies.

Devin Phone #: ###-####
FIR18-00787 INSP-Sprinkler Rough-in11/7/201811/13/201811/13/2018 2:59:25 PMPCANC
Per the fitter the revised plans have not been approved yet. No inspection was performed.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00298 INSP-Sprinkler Rough-in11/12/201811/13/201811/13/2018 2:09:49 PMPPART
The rough-in for the most part is passed. It appeears additional hangers are needed for the cpvc piping. Also as-builts need to be approved showing all of the additional fittings that have been added including the two 90's at the base of the riser and the 90's added on the cpvc piping grid lines.

Contact Scott Powada ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00414 INSP-Final Inspection11/9/201811/13/201811/13/2018 1:54:58 PMPCANC
The fire alarm inspection failed. No sprinkler permit items tested.

Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-01850 FIRE-Final Inspection11/9/201811/13/201811/13/2018 12:58:06 PMAPASS
Life safety passed. No sprinkler work

Please give me a call ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
BLD18-01423 FIRE-Final Inspection11/9/201811/13/201811/13/2018 12:20:56 PMAPASS
Life safety passed. The thumbturn deadbolt on the Pick and Go room needs removed prior to a building inspection as per our conversation

please give me a call ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
FIR18-00544 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:29:15 AMPCANC
Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00544 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:28:59 AMPCANC
Problem with the hydro pump.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00545 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:28:24 AMPCANC
Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00545 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:28:09 AMPCANC
Problem with hydro pump.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00608 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:27:40 AMPCANC
Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00608 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:27:22 AMPCANC
Problem with hydro pump

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00601 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:26:52 AMPCANC
Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00601 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:26:38 AMPCANC
Problem with hydro pump

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00813 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:26:06 AMPCANC
Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00813 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:25:47 AMPFAIL
Piping was not holding minimum starting pressure

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00563 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:24:54 AMPCANC
Problem with hydro pump

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00563 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:24:20 AMPCANC
Problem with hydro pump

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00562 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:23:42 AMPCANC
Problem with hydro pump

Hydro Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00519 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:22:59 AMPCANC
Problem with hydro pump.
FIR18-00519 INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018 11:22:03 AMPFAIL
Underground supply was not at the minimum starting pressure for a hydro test.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00562 INSP-Supply line flush11/8/201811/13/201811/13/2018 11:18:54 AMPCANC
Not ready due to pump problems

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00609 INSP-Sprinkler Rough-in/Hydro11/9/201811/13/201811/13/2018 10:48:30 AMAPART
Overhead Rough-In is partially passed. See the city approved plans for corrections needed with some earthquake bracing. Also need ceilings removed to inspect the new sprinkler piping. As-builts will be required prior to a final sign off showing the riser being relocated and some small pipe size changes and new area being sprinklered. The overhead hydro inspection passed with no visible loss on the guage.. Cesar Rodriguez is Foreman Phone #: ###-#### Inspection requested via web by Brett Lawatch
FIR18-00590 INSP-Sprinkler Rough-in11/12/201811/13/201811/13/2018 10:22:28 AMAPASS
See the city approved plans for rooms marked "ok" where sprinkler piping can be covered. I noted in a few rooms that the upright sprinkler protection is blocked by duct work and will need to meet the obstruction charts of NFPA 13
FIR18-00592 INSP-Sprinkler Rough-in11/9/201811/13/201811/13/2018 9:35:20 AMAPASS
The sprinkler piping above the hardlids in the Restrooms is ok for cover.
FIR18-00767 INSP-Final Inspection11/12/201811/13/201811/13/2018 9:19:25 AMAFAIL
No access to the fire alarm panel. Lock is brocken. Will need to be rescheduled.