BLD19-00843
| FIRE-Conference | 11/12/2019 | 11/14/2019 | 11/14/2019 3:11:21 PM | P | DONE |
|
|
We discussed possible combustible concealed spaces caused by the climbing wall construction. Phone #: ###-#### Inspection requested via web by Zach Carter
|
FIR19-00706
| INSP-Final Inspection | 11/14/2019 | 11/14/2019 | 11/14/2019 1:26:57 PM | P | PASS |
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
NAF19-00110
| INSP-Supply line flush | 11/13/2019 | 11/14/2019 | 11/14/2019 12:52:59 PM | A | PART |
|
|
The remaining underground supply piping is ok for cover. The flush was not ready due to waiting on a thrust block on unrelated piping at the crosss ; flush Troy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR18-00892
| INSP-Sprinkler Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 12:31:51 PM | P | PASS |
|
|
The tenting is approved on the second floor only as per the email/letter from American Fire taking responcibility for the the tenting installation. Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR19-00531
| INSP-Final Inspection | 11/13/2019 | 11/14/2019 | 11/14/2019 11:37:25 AM | A | PASS |
|
|
Permit finaled.
Call about 20 mins before // Rick Phone #: ###-####
|
FIR19-00700
| INSP-Final Inspection | 11/13/2019 | 11/14/2019 | 11/14/2019 9:24:02 AM | A | PASS |
|
|
Permit finaled.
Nick is your contact Phone #: ###-#### Inspection requested via web by Chris Green
|
FIR19-00832
| INSP-Sprinkler Rough-in | 11/13/2019 | 11/14/2019 | 11/14/2019 9:23:44 AM | A | PASS |
|
|
Tenting passed. Piping can be covered.
Gabe is the field contact. Thanks for all your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|