BLD17-01173
| FIRE-Final Inspection | 11/22/2017 | 11/27/2017 | 11/27/2017 1:44:49 PM | A | FAIL |
|
|
Install Knox Box, finish installing the exit discharge lights, finish concrete infront of south exit door.
Mark Phone #: ###-####
|
FIR17-00663
| INSP-Final Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 1:39:04 PM | P | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Robert Gobler
|
FIR17-00602
| INSP-Final Inspection | 11/21/2017 | 11/27/2017 | 11/27/2017 1:31:16 PM | P | FAIL |
|
|
Left a voice message with the contact that I would be there in 10 minutes. Arrived at project and waited another 10 minutes before leaving another message and then leaving project.
No inspectoin was perfromed.
Travis Phone #: ###-####
|
FIR17-00329
| INSP-Final Inspection | 11/22/2017 | 11/27/2017 | 11/27/2017 11:51:38 AM | P | PASS |
|
|
Permit finaled
Rick Phone #: ###-####
|
FIR17-00433
| INSP-Sprinkler Rough-in | 11/27/2017 | 11/27/2017 | 11/27/2017 10:43:35 AM | P | PASS |
|
|
The sprinkler piping above the lay-in ceiling tile is ok to cover.
|
BLD16-02147
| FIRE-Final Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 8:37:42 AM | A | PASS |
|
|
Life safety passed. The Boise Fire Dept left voice mail that the gates are functional.
Phone #: ###-#### Inspection requested via web by Jeff Hannes
|
BLD17-01088
| FIRE-Final Inspection | 11/22/2017 | 11/27/2017 | 11/27/2017 7:39:29 AM | A | PART |
|
|
Life safety is passed in the two new Pharmacy Rooms in the existing hospital area. Fire alarm and fire sprinkler work is complete.
Charles Phone #: ###-####
|
FIR17-00364
| INSP-Final Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 7:36:17 AM | A | PART |
|
|
The fire alarm work/testing is complete for the new Pharmacy Rooms in the existing hospital. An additional chime was added.
Rafe Phone #: ###-####
|