BLD17-02643
| FIRE-Final Inspection | 11/1/2018 | 11/5/2018 | 11/5/2018 3:23:10 PM | P | FAIL |
|
|
Plans now on site, need fire alarm notification modified as discussed, need to hang fire extinguisher and repair the exit sign.
lynn Phone #: ###-####
|
FIR18-00654
| INSP-Sprinkler Rough-in/Hydro | 11/2/2018 | 11/5/2018 | 11/5/2018 2:56:06 PM | P | PASS |
|
|
The remaining length of underground is ok for cover. Plans need to be resubmitted showing the new underground pipe routing. Also I spoke with the contractor about possible bury depth issues as previously noted.
Please call Clarncce Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
BLD18-03908
| FIRE-Final Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 2:41:02 PM | P | FAIL |
|
|
Repair the existing fire alarm panel, provide annual inspection for the fire extinguishers and the existing fire sprinkler system, provide sprinkler modifications for the printing area on the first floor Lobby area.
Bryan Phone #: ###-####
|
FIR18-00570
| INSP-Final Inspection | 11/4/2018 | 11/5/2018 | 11/5/2018 2:19:07 PM | A | CANC |
|
|
We received the ROC but as-builts have not been provided. Ken will have finished tonight and submitted tomorrow.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
BLD18-03947
| FIRE-Final Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 1:53:15 PM | P | PASS |
|
|
life safety passed. Plan review approved the new exit path.
Steve Phone #: ###-####
|
FIR18-00617
| INSP-Sprinkler Rough-in | 11/5/2018 | 11/5/2018 | 11/5/2018 1:44:26 PM | P | PASS |
|
|
See the city approved plans for piping marked "ok" that can be covered in the Kitchen area.
Rough to Cover inspection for Phase 2. Foreman is Zack Grasmick Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
FIR17-00708
| INSP-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 12:25:11 PM | A | CANC |
|
|
Todd wants to reschedule for tomorrow when he has fittings to set off the flow switch.Todd Phone #: ###-####
|
FIR18-00738
| INSP-Sprinkler Rough-in/Hydro | 11/5/2018 | 11/5/2018 | 11/5/2018 11:52:45 AM | P | CANC |
|
|
Scheduled for the wrong day.
Hydro Test for 8" UG.
Please call Troy with time frame. Thanks Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR18-00702
| INSP-Final Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 11:34:56 AM | P | CANC |
|
|
To be rescheduled with life safety inspection per discussion with Tom.
We would like to perform this inspection in conjunction with the fire life safety final for the BLD permit.
Please call Tom with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
BLD18-01505
| FIRE-Final Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 11:06:36 AM | P | PASS |
|
|
Life safety passed
Call half hour before to meet // Ken Phone #: ###-####
|
BLD18-04013
| FIRE-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 10:10:42 AM | A | PASS |
|
|
Life safety passed
Tsering Phone #: ###-####
|
BLD17-03833
| FIRE-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 9:50:16 AM | A | FAIL |
|
|
Not ready for final. Todays final was for approval for cover of the platform. It appears to have been completely filled with insulation and is ok for cover.
Clive Phone #: ###-####
|
BLD18-02771
| FIRE-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 9:49:09 AM | A | PASS |
|
|
Life safety passed. The sticker at door and occupant load sign to be installed prior to a building inspeciton
Please call ahead for access - David Phone #: ###-####
|