BLD17-03648
| FIRE-Conference | 11/7/2018 | 11/7/2018 | 11/7/2018 2:27:11 PM | P | DONE |
|
|
I verified exit light and emergency light function
|
FIR18-00267
| INSP-Sprinkler Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 2:21:53 PM | A | PASS |
|
|
See the city approved plans for the area in the lower level of the parking garage where piping is ok for cover.
cover // Justin Phone #: ###-####
|
FIR18-00414
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 1:50:55 PM | P | CANC |
|
|
Could not perform testing due to fire alarm communication issues. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00333
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 1:50:25 PM | P | CANC |
|
|
No permit can be found for the AES dialer. No testing performed until the communication is approved.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR18-00761
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 11:50:11 AM | A | CANC |
|
|
Rescheduled for friday per Randy
r=Randy Courtwright Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR18-00821
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 11:49:22 AM | A | CANC |
|
|
Rescheduled per Dirk.
Contact is Dirk. Requesting a 7:00am inspection time. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR18-00311
| INSP-Sprinkler Rough-in/Hydro | 11/6/2018 | 11/7/2018 | 11/7/2018 11:34:32 AM | A | PART |
|
|
The sprinkler rough-in passed but the tenting failed. No piping to be covered until tenting is passed.
|
FIR18-00675
| INSP-Sprinkler Rough-in/Hydro | 11/6/2018 | 11/7/2018 | 11/7/2018 10:43:38 AM | A | PASS |
|
|
Underground Hydro passed. Rough to cover passed. Piping can be covered.
|
NAF18-00113
| INSP-Final | 11/6/2018 | 11/7/2018 | 11/7/2018 10:20:19 AM | A | FAIL |
|
|
No city approved plans on site. A contractor had non-approved plans that had a differenct wall lay out. I let the owner and the contrator know that plans will need to be revised if the approved do not match.
Call prior to going Phone #: 2088695205 >> Inspection requested via mobile web by Paula Lambert
|
FIR18-00592
| INSP-Sprinkler Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 9:19:07 AM | A | PASS |
|
|
See the city approved plans for locations for four heads/piping that the hardlids are ok for cover.
Contact Ken Orahood ###-#### 30 Min prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF18-00118
| INSP-Final | 11/6/2018 | 11/7/2018 | 11/7/2018 9:05:22 AM | A | DONE |
|
|
Permit finaled
Single head position reviewed and approved by Adele and Ron. Phone #: ###-#### Inspection requested via web by Mick Woodburn
|
FIR18-00849
| INSP-Sprinkler Rough-in | 11/5/2018 | 11/7/2018 | 11/7/2018 9:02:30 AM | A | PART |
|
|
The work as installed and per the plans appears ok. The issue is an outstanding fire sprinkler permit for the shell/core sprinkler system that has never been finaled. Prior to any cover inspections being given I will need Treasure Valley Fire Protection to schedule an inspection so that any original items can be verified. I spoke to Phoenix Fire and TVFP and the general contractor about this issue.
|
FIR18-00733
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 8:21:12 AM | A | CANC |
|
|
Please call 1/2 before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|
FIR18-00683
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 7:49:08 AM | A | CANC |
|
|
Please call 1/2 before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|
FIR18-00161
| INSP-Final Inspection | 11/5/2018 | 11/7/2018 | 11/7/2018 7:39:52 AM | P | CANC |
|
|
need after 3:30 Phone #: ###-#### >> Inspection requested via web by Bill Harmon Inspection cancelled from web by: Bill Harmon
|
BLD18-02665
| FIRE-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 7:31:59 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
|
FIR18-00807
| INSP-Sprinkler Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 7:23:00 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
Adam Phone #: ###-####
|
FIR18-00686
| INSP-Sprinkler Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 12:00:00 AM | A | FAIL |
|
|
Sesmic Restraints needed
Sesmic Bracing incorrect based on drawing. (This item will be consulted with the assitant fire marshal next week.)
Face Bushing OK
Side walls off the wall to be verified by Ron based on manufactuer
As builts are to be provided at the end of the project.
|
FIR18-00515
| INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 12:00:00 AM | A | PASS |
|
|
Please call 1/2 before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis
|
BLD17-04370
| FIRE-Conference | 11/6/2018 | 11/7/2018 | 11/6/2018 2:17:23 PM | A | DONE |
|
|
I stopped at the job site and let the tenant know that a sprinkler analysis will be required. After further discussion with the plan reviewer the column protection will not be required unless the storage height exceeds 15'
|