Inspections for the day of: Thursday, December 13, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00390 INSP-Final Inspection12/12/201812/13/201812/13/2018 2:25:17 PMPPASS
Permit finaled

Call Matt Clark 30 Minutes before if possible. Phone #: ###-#### Inspection requested via web by jason petty
FIR17-00736 INSP-Final Inspection12/12/201812/13/201812/13/2018 2:17:00 PMPPASS
Permit finaled

Please call Matt Clark 30 minutes ahead if possible Phone #: ###-#### Inspection requested via web by jason petty
NAF18-00137 INSP-Final12/13/201812/13/201812/13/2018 1:12:30 PMPFAIL
Provide ADA approved single action hardware on the marked exit door.

Phone #: 2088307115 >> Inspection requested via mobile web by Vince
FIR18-00864 INSP-Sprinkler Rough-in12/13/201812/13/201812/13/2018 12:55:08 PMPPASS
Rough-in passed. All piping can be covered.

Mike Phone #: ###-####
FIR18-00709 INSP-Final Inspection12/13/201812/13/201812/13/2018 12:05:03 PMPPASS
Permit finaled

Jeremy Phone #: ###-####
BLD18-03987 FIRE-Final Inspection12/12/201812/13/201812/13/2018 11:43:12 AMAPASS
Life safety passed.

Jeff Phone #: ###-####
FIR18-00455 INSP-Alarm Testing12/12/201812/13/201812/13/2018 11:31:23 AMAFAIL
The inspection today was just for the third floor. Need horn added in the southwest corner. Need strobe in the Executive Break Room. Need all tampers and flow switches tested that effect the third floor and exit pass. Need elevators tested. Need plan mods showing address changes and different NAC panels being used.

Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
FIR18-00583 INSP-Sprinkler Rough-in12/12/201812/13/201812/13/2018 11:28:55 AMAPASS
This inspection was for the Area "C" Fitness Center. Piping can be covered. Per contractor the limited use of wood is fire rated.

Tony Phone #: ###-####
FIR18-00428 INSP-Final Inspection12/12/201812/13/201812/13/2018 11:27:25 AMAFAIL
All tile on the 3rd floor is installed but the path of egress on the second floor and first floor have sprinkler issues which include shipping caps still on pendants and lay-in tile missing. Per Jim the only tampers and flow switches tested have been for the second floor.
Tony Phone #: ###-####
FIR18-00569 INSP-Alarm Testing12/12/201812/13/201812/13/2018 8:24:35 AMAPART
Only the four fire smoke dampers and the east side duct detector were tested today in the Gym. The west side hvac unit did not function.

Phone #: ###-#### Inspection requested via web by Ken Webster