Inspections for the day of: Monday, December 17, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00911 INSP-Sprinkler Rough-in12/17/201812/17/201812/17/2018 3:06:14 PMAPASS
Provide missing hanger and missing head at the top of the stairs. Piping is ok for cover.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD18-01064 FIRE-Final Inspection12/14/201812/17/201812/17/2018 2:39:51 PMPPART
Phase 1 life safety passed.

lobby 2nd and 1st and 3rd floor-Dave Phone #: ###-####
BLD18-01593 FIRE-Final Inspection12/17/201812/17/201812/17/2018 2:38:55 PMPPART
Life safety for the Link is passed. Dave is going to place fire extinguishers at both ends of the Link. An additional stobe is needed at the Building 36 (LOBBY) end of the link. I spoke to Ron with Boise Fire about this. A separate permit will be needed for this work.

dave Phone #: ###-####
FIR18-00455 INSP-Alarm Testing12/17/201812/17/201812/17/2018 2:36:45 PMPPART
Phase 1 fire alarm work is complete.

Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
FIR18-00455 INSP-Final Inspection12/17/201812/17/201812/17/2018 2:34:35 PMPPART
Phase 1 fire alarm work complete. The smoke detectors for elevator return now send alarm not supervisory signals.

Adam Phone #: ###-####
FIR18-00919 INSP-Final Inspection12/17/201812/17/201812/17/2018 2:33:13 PMPPART
Fire alarm work for the Link is complete. Two smoke detectors need to be relocated so that they are centered in the doors at both ends. This will be checked at the next inspection.

phase 1- Adam Phone #: ###-####
FIR18-00592 INSP-Final Inspection12/14/201812/17/201812/17/2018 12:29:07 PMPCANC
Contact Ken Orahood ###-#### 30 min prior to Fire Final Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
FIR18-00482 INSP-Final Inspection12/14/201812/17/201812/17/2018 11:55:25 AMPFAIL
Project is not ready for a final yet. During the initial walk through I found over spaced stobes and one area where new costruction, not shown on the plans, has caused spacing issues with the strobes. Contractor is going to provide as-builts with the modified candellas and addtional strobes required for the new construction. Also I noted to small rooms being used as open office areas that will require notificaiton. No other testing was performed.

Please call before arrival so I can plan to meet at site. Phone #: ###-#### Inspection requested via web by Kyle Burgess
FIR18-00787 INSP-Sprinkler Rough-in12/13/201812/17/201812/17/2018 10:01:09 AMAPASS
Rough-in passed. Tenting passed. Piping is ok for cover. Supply piping size to the backflow preventor does not match plans and will need addressed prior to a final sign off.


Marcus Smith is the contact for this RTC inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-03804 FIRE-Final Inspection12/16/201812/17/201812/17/2018 9:38:49 AMAPASS
Life safety passed. Permit number on line did not match the one on the plans. It was corrected.