BLD17-04653
| FIRE-Conference | 12/27/2018 | 12/27/2018 | 12/27/2018 2:17:11 PM | P | DONE |
|
|
Don and I discussed combustible concealed spaces formed by the exhaust duct housings and possible solutions.
|
FIR18-00899
| INSP-Sprinkler Rough-in | 12/26/2018 | 12/27/2018 | 12/27/2018 1:45:01 PM | P | PASS |
|
|
Basement work, Phase 1 work rough-in passed.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
NAF18-00057
| INSP-Final | 12/26/2018 | 12/27/2018 | 12/27/2018 11:59:18 AM | A | CANC |
|
|
To be rescheduled when the project related fire alarm permit has been scheduled per my conversation with Rick.
Cordinate inpsection with Rick Fry Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
FIR18-00856
| INSP-Conference | 12/27/2018 | 12/27/2018 | 12/27/2018 10:39:32 AM | P | DONE |
|
|
After confering with Adele and Ron a 200lb hyro test and a 24 hour air test will be required prior to a final sign off. I will need to have the installation guide for the Nitrogen Generator to verify maximum leakage allowed as well.
|
BLD18-04373
| FIRE-Conference | 12/26/2018 | 12/27/2018 | 12/27/2018 10:00:23 AM | A | DONE |
|
|
Provide sticker at the main exit door, remove the thumb turn dead bolt at the main door (keyed is ok), remove deadbolt from the inner door, provide single action hardware on the north exterior exit door, provide annual inspection for the common fire extinguisher.
Amy Phone #: ###-####
|
NAF18-00074
| INSP-Final | 12/27/2018 | 12/27/2018 | 12/27/2018 9:06:40 AM | P | DONE |
|
|
life safety passed. Fire alarm has been corrected.
Call prior to going Phone #: 2085736913 >> Inspection requested via mobile web by David
|
FIR18-00915
| INSP-Sprinkler Rough-in/Hydro | 12/26/2018 | 12/27/2018 | 12/27/2018 8:31:07 AM | A | PASS |
|
|
Piping in the two rooms that have been marked "ok" can be covered. I spoke to Leroy about the large note that if any ceiling exceed 10' then plan modifications will be needed.
rough to cover for sheet rock // Austin Phone #: ###-####
|