FIR19-00172
| INSP-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 3:06:08 PM | A | FAIL |
|
|
Permit will be ok to final when the plan mods have been approved.
As early as possible Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR19-00353
| INSP-Sprinkler Rough-in | 12/3/2019 | 12/3/2019 | 12/3/2019 2:18:47 PM | P | PASS |
|
|
2nd floor hard lids are ok for cover. thank you Phone #: ###-#### Inspection requested via web by jeremiah robison
|
BLD18-02176
| FIRE-Final Inspection | 12/3/2019 | 12/3/2019 | 12/3/2019 1:52:16 PM | P | FAIL |
|
|
Inspection was actually for a conference to provide guide lines for the use of the south end/sales are for a Christmas function. It appears the gate for the existing fire hydrant needs installed, building address, Riser and Electrical Room signage, grading permit sign off, fire extinguishers mounted and a fire dept approved temp barrier to the rest of the building. Also needed is a building inspection and approval for the use of the building/area.
Nacho Phone #: ###-####
|
BLD19-04697
| FIRE-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 1:26:07 PM | P | FAIL |
|
|
Provide annual inspection tag for fire extinguisher, provide sticker at door and suite number.
Shaun Phone #: ###-####
|
FIR19-00511
| INSP-Sprinkler Rough-in/Hydro | 12/2/2019 | 12/3/2019 | 12/3/2019 1:14:38 PM | P | PASS |
|
|
Overhead hydro passed. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00290
| INSP-Sprinkler Rough-in/Hydro | 12/3/2019 | 12/3/2019 | 12/3/2019 1:14:06 PM | P | PASS |
|
|
Overhead hydro passed and pendants have been modified in the second open office.
Todd Ketterling is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-03209
| FIRE-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 10:22:15 AM | A | PART |
|
|
Life safety passed for Phase 1/Building B. Will need the project related fire alarm permit finaled prior to a Phase 1 sign off.
Tom Phone #: ###-####
|
FIR18-00886
| INSP-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 10:07:35 AM | A | FAIL |
|
|
Not ready for a final yet. This inspection is for a sprinkler rough-in. See the city approved plans additional heads where piping is ok for cover. I noted on pendant that still needs changed to quick responce and verification that the extended coverage heads can be used in a Storage Room.
Contact Hunter Anderson ###-#### 30 min prior to TCO/Final Insp start please Hunter prefers an early AM inspection if possible
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00957
| INSP-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 8:49:28 AM | A | PASS |
|
|
Permit finaled. Forward flush witnessed. Phone #: ###-####
|
BLD19-04343
| FIRE-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 8:48:58 AM | A | PASS |
|
|
Life safety passed.
Call ahead // Jesse Phone #: ###-####
|