BLD13-02637
| FIRE-Final Inspection | 12/30/2013 | 12/31/2013 | 12/31/2013 3:33:37 PM | A | PART |
|
|
A temporary occupancy was given with Romeo's permission until the project related fire alarm permit has been finaled.
|
FIR13-00672
| INSP-Final Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 3:31:21 PM | P | PART |
|
|
A temporary was given with Romeo's permission. At issue are the strobes whose effect can not be seen in all areas as required in NFPA 72 sections 18.5.4.1 through 18.5.4.3
|
BLD13-03148
| FIRE-Final Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 2:15:24 PM | P | PASS |
|
|
life safety passed. Per Carl Madsen in plan review the fire doors are not required for this occupancy. Also the existing fire alarm system was removed by Alarm Star without a permit. But it appears, from discussion with scott arellano, that the system is not required for this occupancy.
|
FIR13-00707
| INSP-Final Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 11:08:35 AM | P | PASS |
|
|
permit finaled
|
BLD13-03280
| FIRE-Final Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 11:06:57 AM | P | PASS |
|
|
life safety passed
|
FIR13-00665
| INSP-Final Inspection | 12/30/2013 | 12/31/2013 | 12/31/2013 10:27:12 AM | A | PASS |
|
|
permit finaled
|
FIR13-00187
| INSP-Alarm Testing | 12/30/2013 | 12/31/2013 | 12/31/2013 10:11:27 AM | A | DONE |
|
|
Todays inspection was for the remaining notification device function. All devices tested ok except a horn only was installed where a strobe is shown in a corridor in the Auditorium and there was one non-functional ceiling mounted strobe in the east main lobby restroom of the Gym.
|