BLD18-02834
| FIRE-Final Inspection | 12/5/2018 | 12/6/2018 | 12/6/2018 3:34:21 PM | A | FAIL |
|
|
I'm working with Collier's and the Boise Fire Dept on the required upgrade to the fire sprinkler system that was an issue in 2016. Also need the painted head in the restroom replaced, fire extinguisher hung as discussed and the door hardware changed to single action ADA type as discussed. The fire sprinkler permit needs finaled as well.
Tony Phone #: ###-####
|
FIR18-00566
| INSP-Conference | 12/6/2018 | 12/6/2018 | 12/6/2018 2:00:46 PM | P | DONE |
|
|
Went over strobe spacing with the electrian. I noted several strobes that will need to be relocated or increased candella. I'm questioning the placement and function of smoke detector 81 in the Gymnasium.
|
FIR18-00408
| INSP-Sprinkler Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 1:44:41 PM | P | CANC |
|
|
To be canceled per fitter until the plans with revisions have been approved and are on site.
Josh Eaton is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00592
| INSP-Sprinkler Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 1:44:04 PM | P | PASS |
|
|
The remaining sprinkler piping is ok for cover.
Contact Ken Orahood ###-#### 30 Min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD18-03174
| FIRE-Final Inspection | 12/4/2018 | 12/6/2018 | 12/6/2018 9:21:59 AM | A | FAIL |
|
|
Provide revised floor plan showing the actual wall layout and that door 106 is not there , provide exit signs/emergency lights as per the plans and review comments or get revised plans, remove dead bolt from west side door and provide single action hardware for the restroom door, provide fire sprinkler coverage for the lean too's/sheds that are attatched to the building, provide racking permit for the storage racks that exceed 8'
Brad Phone #: ###-####
|