FIR19-00661
| INSP-Sprinkler Rough-in/Hydro | 12/6/2019 | 12/6/2019 | 12/6/2019 3:01:18 PM | P | PASS |
|
|
Underground hydro test witnessed.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
BLD18-02644
| FIRE-Conference | 12/6/2019 | 12/6/2019 | 12/6/2019 2:02:08 PM | P | DONE |
|
|
Jason and I went over life safety requirements for the remaining phase of work for this project. Need verification that exit discharge lights will not be required out of the two remaining marked exits.
|
BLD19-04038
| FIRE-Final Inspection | 12/6/2019 | 12/6/2019 | 12/6/2019 1:42:13 PM | P | PASS |
|
|
Life safety passed. Per addressing the correct address is 204.
Sid Phone #: ###-####
|
FIR19-00770
| INSP-Sprinkler Rough-in | 12/6/2019 | 12/6/2019 | 12/6/2019 1:23:29 PM | P | PASS |
|
|
Tenting passed. Piping can be covered.
|
BLD18-02176
| FIRE-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 12:49:21 PM | A | FAIL |
|
|
Not ready for a final yet. This inspection was for the Boise Fire dept determination of an Operational Permit for a Christmas Party. The Sales area, south portion, of the new building has its life safety inspection approved. I contacted Chief Ron with the Boise Fire Dept. and let him know. Nacho Phone #: ###-####
|
FIR19-00894
| INSP-Sprinkler Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 11:43:33 AM | A | PASS |
|
|
The remaining underground tie-in piping is ok for cover.
hone #: ###-#### Inspection requested via web by Sam Ball
|
BLD19-00100
| FIRE-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 11:31:19 AM | P | PASS |
|
|
Life safety passed. Call for access- Russ Phone #: ###-####
|
BLD19-01513
| FIRE-Sprinkler Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 10:42:21 AM | A | PASS |
|
|
Tenting inspection for the fire sprinklers passed. Piping can be covered. Call Brad before/during inspection. Thank you, Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD19-04707
| FIRE-Final Inspection | 12/3/2019 | 12/6/2019 | 12/6/2019 10:28:12 AM | A | PASS |
|
|
life safety passed
Hannan Phone #: ###-####
|
BLD19-03317
| FIRE-Final Inspection | 12/6/2019 | 12/6/2019 | 12/6/2019 9:35:52 AM | P | PASS |
|
|
Life safety passed. Ron Phone #: ###-####
|
FIR19-00092
| INSP-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 9:34:17 AM | A | FAIL |
|
|
Tenant would not let us set off alarms so I did a walk through and checked device locations. I noted acouple changes that will be needed and that as-builts will be required to reflect these changes.
Contact is Dirk. Dirk will be available after 9am. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
NAF19-00071
| INSP-Sprinkler Rough-in/Hydro | 12/5/2019 | 12/6/2019 | 12/6/2019 12:00:00 AM | A | PASS |
|
|
**PASS* Hydro passed. Heads that were blocked byfaux beams have been relocated.*MAS***
Gabe is the contact.Thanks for all you do! Phone #: ###-#### >> Inspection requested via web by Stan Beus
|