BLD17-02915
| FIRE-Final Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 3:17:57 PM | P | FAIL |
|
|
Provide fire extinguisher on the mezzanine, provide a exit discharge light at the main exit, provide double door with panic hardware at the rear exit as per the T.I. plans
Hugo Phone #: ###-####
|
BLD17-01548
| FIRE-Conference | 2/1/2018 | 2/1/2018 | 2/1/2018 3:02:36 PM | P | DONE |
|
|
We discussed life safety items such as possible exit discharge lighting and interconnection of the access control egress locks with the new fire alarm system
|
FIR17-00733
| INSP-Conference | 2/1/2018 | 2/1/2018 | 2/1/2018 2:34:37 PM | P | DONE |
|
|
We dicussed strobe modifications in the first floor lobby and in the basement.
John Phone #: ###-####
|
BLD17-03247
| FIRE-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 2:26:46 PM | A | FAIL |
|
|
Need the project related fire alarm permit addressed. Will be ok for a temp when the fire alarm permit is finaled. For a final, the exit discharge light above the front exit will need to be installed.
Byron Phone #: ###-####
|
FIR17-00352
| INSP-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 1:54:56 PM | P | PASS |
|
|
Permit finaled
|
BLD16-04308
| FIRE-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 1:54:36 PM | A | FAIL |
|
|
Need smoke alarms to be located atleast 3' from fan blades and re-tested, need fees paid and inspection called in for the project related fire alarm permit. Need paint removed from the FDC.
|
FIR17-00453
| INSP-Sprinkler Rough-in | 2/1/2018 | 2/1/2018 | 2/1/2018 12:33:33 PM | P | PASS |
|
|
Underground Inspection passed. Piping can be covered.
|
FIR17-00450
| INSP-Sprinkler Rough-in | 2/1/2018 | 2/1/2018 | 2/1/2018 12:33:05 PM | P | PASS |
|
|
Underground Inspection passed. Piping can be covered
|
FIR17-00493
| INSP-Sprinkler Rough-in | 2/1/2018 | 2/1/2018 | 2/1/2018 10:53:54 AM | P | CANC |
|
|
underground inspection okay to cover Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
FIR17-00541
| INSP-Sprinkler Rough-in | 1/31/2018 | 2/1/2018 | 2/1/2018 9:19:47 AM | A | PASS |
|
|
24 hour air test passed. The remaining second floor piping rough-in passed. Piping can be covered. Plan Mod needed showing pipe routing changes for 3" mains and Pre-action system.
|