FIR17-00603
| INSP-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 2:41:32 PM | P | PART |
|
|
Phase three sprinkler work is complete.
Todd Ketterling is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00600
| INSP-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 1:57:39 PM | P | PASS |
|
|
Hood suppression system functioned correctly.
Phone #: ###-#### Inspection requested via web by Don Kartchner
|
BLD19-00063
| FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 1:52:42 PM | P | PASS |
|
|
Life safety passed. Contractor was going to remove the thumb turn deadbolt on the main exit door and replace with keyed prior to a building inspection.
Randy Phone #: ###-####
|
FIR19-00061
| INSP-Sprinkler Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 11:54:36 AM | A | DONE |
|
|
Inspection was a conference for Building D. I noted that plan modifications are needed for the pipe size changes, pipe re-routing and additional heads. Also it appears separate risers are needed for the first and second floors after discussion with the plan reviewer. contact Nic Smith for schedule. Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
NAF18-00124
| INSP-Sprinkler Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 11:45:43 AM | A | PASS |
|
|
The piping can be covered in the East Stair walls, first and second floors, and in the first floor rooms as marked at the bottom of the East Stairs. Also piping rough-in for the Riser Room and the adjoining Electrical Room is passed.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
BLD18-03174
| FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 11:24:14 AM | A | PASS |
|
|
Life safety passed. Previous corrections made. Per notes Troy James verified dust collection. The racks have been removed and there is no paint booth within the scope of work.
Call 15 minutes ahead // Jeff Phone #: ###-####
|
FIR18-00915
| INSP-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 9:29:15 AM | A | PASS |
|
|
Permit finaled
|
FIR19-00073
| INSP-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 9:28:44 AM | A | PASS |
|
|
Permit finaled
|
BLD18-04376
| FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 8:21:06 AM | A | CANC |
|
|
Please call 45 minutes before arrival. Thank you Phone #: ###-#### >> Inspection requested via web by Tony Dondero Inspection cancelled from web by: Tony Dondero
|
BLD18-04246
| FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 8:21:00 AM | A | CANC |
|
|
Please call 45 minutes before arrival. Thank you Phone #: ###-#### >> Inspection requested via web by Tony Dondero Inspection cancelled from web by: Tony Dondero
|
BLD18-04376
| FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/11/2019 2:51:17 PM | P | CANC |
|
|
Please call 45 minutes before arrival. Thank you Phone #: ###-#### >> Inspection requested via web by Tony Dondero Inspection cancelled from web by: Tony Dondero Inspection cancelled from web by: Tony Dondero
|